CONTACT INFORMATION|4|N743.7|WVE|717-605-3875|jill.sabol@navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x||||||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report |Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER
|TBD|N00104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|N/A|N/A|Certifications - N39040|N/A|N/A|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery |||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2|||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|332919|750||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|
1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency
Preparedness, and Energy Program Use.
3. Only those sources with an acceptable Quality Assurance Manual are eligible for award under this solicitation. The Navy has found from past experience that Quality Control is essential to assure personnel safety in critical areas and to provide for the safe
operation of submarines and certain systems on surface ships. See WSSTERM LZ02. Vendors submitting quality manuals shall submit them to jill.sabol@navy.mil instead of 0243.QAMANUAL@navy.mil.
4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
5. NAVSUP WSS Mech will be considering past performance in the evaluation of offers.
6. If drawings are included in the solicitation, access must be requested on the individual solicitation page on Contract Opportunities via the Government's SAM.gov website. Include your CAGE code in your request.
7. Submission of ALL DD form 1423 certification data (CDRLs) will be on or before 20 days prior to the material (line item 0001AA) delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on
or before 180 days after the effective date of the contract.
8. Please provide the following information:
CAGE CODE: _______________
DELIVERY LEAD TIME: ______________________ ARO
OFFER VALID FOR ___________________ DAYS
EMAIL ADDRESS FOR FOLLOW-UP COMMUNICATIONS _________________
LOCATION OF INSPECTION OF SUPPLIES:
NAME/CAGE _____________________________
ADDRESS________________________________
FINAL ACCEPTANCE AND PACKAGING LOCATION IF DIFFERENT THAN OFFEROR:
NAME/CAGE ______________________________
ADDRESS_________________________________
\
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
DRAWING DATA=4687601 |80064| R| |D|0001 | R|49998|0074218
DRAWING DATA=4687601 |80064| R| |D|0002 | E|49998|0101561
DRAWING DATA=4687601 |80064| R| |D|0002.1 | F|49998|0071751
DRAWING DATA=4687601 |80064| R| |D|0002.2 | H|49998|0071204
DRAWING DATA=4687601 |80064| R| |D|0002.3 | K|49998|0092436
DRAWING DATA=4687601 |80064| R| |D|0002.4 | R|49998|0076139
DRAWING DATA=4687601 |80064| R| |D|0003 | R|49998|0099494
DRAWING DATA=4687601 |80064| R| |D|0003.1 | R|49998|0100197
DRAWING DATA=4687601 |80064| R| |D|0003.2 | R|49998|0122916
DRAWING DATA=4687601 |80064| R| |D|0003.3 | R|49998|0087367
DRAWING DATA=4687601 |80064| R| |D|0004 | M|49998|0051299
DRAWING DATA=4687601 |80064| R| |D|0005 | A|49998|0057945
DRAWING DATA=4687601 |80064| R| |D|0005.1 | D|49998|0057417
DRAWING DATA=4687601 |80064| R| |D|0005.2 | M|49998|0065999
DRAWING DATA=4687601 |80064| R| |D|0005.3 | N|49998|0028172
DRAWING DATA=4687601 |80064| R| |D|0006 | M|49998|0044092
DRAWING DATA=4687601 |80064| R| |D|0007 | F|49998|0059866
DRAWING DATA=4687601 |80064| R| |D|0009 | H|49998|0045142
DRAWING DATA=4687601 |80064| R| |D|0011 | M|49998|0047743
DRAWING DATA=4687601 |80064| R| |D|0012 | M|49998|0047866
DRAWING DATA=4687601 |80064| R| |D|0014 | H|49998|0052775
DRAWING DATA=4687601 |80064| R| |D|0015 | M|49998|0047868
DRAWING DATA=4687601 |80064| R| |D|0016 | H|49998|0058099
DRAWING DATA=4687601 |80064| R| |D|0017 | H|49998|0055839
DRAWING DATA=4687601 |80064| R| |D|0018 | M|49998|0063042
DRAWING DATA=4687601 |80064| R| |D|0019 | M|49998|0045845
DRAWING DATA=4687601 |80064| R| |D|0020 | M|49998|0047970
DRAWING DATA=4687601 |80064| R| |D|0021 | H|49998|0044732
DRAWING DATA=4687601 |80064| R| |D|0024 | M|49998|0048718
DRAWING DATA=4687601 |80064| R| |D|0025 | J|49998|0085385
DRAWING DATA=4687601 |80064| R| |D|0026 | M|49998|0067836
DRAWING DATA=4687601 |80064| R| |D|0027 | J|49998|0077458
DRAWING DATA=4687601 |80064| R| |D|0028 | M|49998|0063341
DRAWING DATA=4687601 |80064| R| |D|0029 | J|49998|0079512
DRAWING DATA=4687601 |80064| R| |D|0030 | M|49998|0062429
DRAWING DATA=4687601 |80064| R| |D|0031 | J|49998|0079445
DRAWING DATA=4687601 |80064| R| |D|0032 | M|49998|0063486
DRAWING DATA=4687601 |80064| R| |D|0033 | J|49998|0077914
DRAWING DATA=4687601 |80064| R| |D|0034 | M|49998|0062518
DRAWING DATA=4687601 |80064| R| |D|0035 | J|49998|0078435
DRAWING DATA=4687601 |80064| R| |D|0036 | M|49998|0062518
DRAWING DATA=4687601 |80064| R| |D|0037 | J|49998|0078673
DRAWING DATA=4687601 |80064| R| |D|0038 | M|49998|0070528
DRAWING DATA=4687601 |80064| R| |D|0039 | J|49998|0077303
DRAWING DATA=4687601 |80064| R| |D|0040 | M|49998|0064112
DRAWING DATA=4687601 |80064| R| |D|0041 | J|49998|0083713
DRAWING DATA=4687601 |80064| R| |D|0042 | M|49998|0069929
DRAWING DATA=4687601 |80064| R| |D|0043 | J|49998|0077839
DRAWING DATA=4687601 |80064| R| |D|0044 | F|49998|0067140
DRAWING DATA=4687601 |80064| R| |D|0045 | J|49998|0078923
DRAWING DATA=4687601 |80064| R| |D|0046 | M|49998|0067921
DRAWING DATA=4687601 |80064| R| |D|0047 | J|49998|0076403
DRAWING DATA=4687601 |80064| R| |D|0048 | M|49998|0068988
DRAWING DATA=4687601 |80064| R| |D|0049 | J|49998|0078809
DRAWING DATA=4687601 |80064| R| |D|0050 | M|49998|0067756
DRAWING DATA=4687601 |80064| R| |D|0051 | M|49998|0063227
DRAWING DATA=4687601 |80064| R| |D|0054 | H|49998|0063126
DRAWING DATA=4687601 |80064| R| |D|0055 | H|49998|0061157
DRAWING DATA=4687601 |80064| R| |D|0056 | R|49998|0064902
DRAWING DATA=4687601 |80064| R| |D|0057 | M|49998|0047036
DRAWING DATA=4687601 |80064| R| |D|0058 | M|49998|0048140
DRAWING DATA=4687601 |80064| R| |D|0059 | M|49998|0040542
DRAWING DATA=4687601 |80064| R| |D|0062 | F|49998|0042477
DRAWING DATA=4687601 |80064| R| |D|0063 | M|49998|0064035
DRAWING DATA=4687601 |80064| R| |D|0064 | H|49998|0054058
DRAWING DATA=4687601 |80064| R| |D|0065 | H|49998|0054494
DRAWING DATA=4687601 |80064| R| |D|0066 | M|49998|0040077
DRAWING DATA=4687601 |80064| R| |D|0067 | H|49998|0046318
DRAWING DATA=4687601 |80064| R| |D|0068 | H|49998|0047591
DRAWING DATA=4687601 |80064| R| |D|0069 | H|49998|0053420
DRAWING DATA=4687601 |80064| R| |D|0070 | H|49998|0054054
DRAWING DATA=4687601 |80064| R| |D|0074 | F|49998|0051300
DRAWING DATA=4687601 |80064| R| |D|0075 | F|49998|0048899
DRAWING DATA=4687601 |80064| R| |D|0076 | H|49998|0062486
DRAWING DATA=4687601 |80064| R| |D|0077 | J|49998|0049676
DRAWING DATA=4687601 |80064| R| |D|0077.1 | J|49998|0073271
DRAWING DATA=4687601 |80064| R| |D|0078 | M|49998|0048700
DRAWING DATA=4687601 |80064| R| |D|0079 | F|49998|0058675
DRAWING DATA=4687601 |80064| R| |D|0080 | F|49998|0055151
DRAWING DATA=4687601 |80064| R| |D|0081 | H|49998|0050508
DRAWING DATA=4687601 |80064| R| |D|0082 | H|49998|0050888
DRAWING DATA=4687601 |80064| R| |D|0084 | F|49998|0053829
DRAWING DATA=4687601 |80064| R| |D|0085 | M|49998|0046821
DRAWING DATA=4687601 |80064| R| |D|0086 | F|49998|0046516
DRAWING DATA=4687601 |80064| R| |D|0087 | H|49998|0044591
DRAWING DATA=4687601 |80064| R| |D|0088 | C|49998|0049751
DRAWING DATA=4687601 |80064| R| |D|0091 | H|49998|0052521
DRAWING DATA=4687601 |80064| R| |D|0092 | H|49998|0050615
DRAWING DATA=4687601 |80064| R| |D|0101 | F|49998|0073753
DRAWING DATA=4687601 |80064| R| |D|0102 | H|49998|0044628
DRAWING DATA=4687601 |80064| R| |D|0103 | M|49998|0045255
DRAWING DATA=4687601 |80064| R| |D|0104 | F|49998|0065081
DRAWING DATA=4687601 |80064| R| |D|0105 | M|49998|0047742
DRAWING DATA=4687601 |80064| R| |D|0106 | F|49998|0066949
DRAWING DATA=4687601 |80064| R| |D|0107 | N|49998|0049042
DRAWING DATA=4687601 |80064| R| |D|0108 | F|49998|0064545
DRAWING DATA=4687601 |80064| R| |D|0109 | M|49998|0047511
DRAWING DATA=4687601 |80064| R| |D|0110 | F|49998|0062702
DRAWING DATA=4687601 |80064| R| |D|0111 | M|49998|0047052
DRAWING DATA=4687601 |80064| R| |D|0112 | H|49998|0066522
DRAWING DATA=4687601 |80064| R| |D|0113 | M|49998|0046519
DRAWING DATA=4687601 |80064| R| |D|0114 | F|49998|0065610
DRAWING DATA=4687601 |80064| R| |D|0115 | M|49998|0046699
DRAWING DATA=4687601 |80064| R| |D|0116 | J|49998|0080535
DRAWING DATA=4687601 |80064| R| |D|0117 | M|49998|0070831
DRAWING DATA=4687601 |80064| R| |D|0118 | M|49998|0047305
DRAWING DATA=4687601 |80064| R| |D|0119 | J|49998|0080370
DRAWING DATA=4687601 |80064| R| |D|0120 | M|49998|0069521
DRAWING DATA=4687601 |80064| R| |D|0121 | C|49998|0043707
DRAWING DATA=4687601 |80064| R| |D|0122 | M|49998|0047554
DRAWING DATA=4687601 |80064| R| |D|0123 | C|49998|0052453
DRAWING DATA=4687601 |80064| R| |D|0124 | M|49998|0039248
DRAWING DATA=4687601 |80064| R| |D|0125 | M|49998|0070839
DRAWING DATA=4687601 |80064| R| |D|0126 | J|49998|0051737
DRAWING DATA=4687601 |80064| R| |D|0126.1 | J|49998|0073359
DRAWING DATA=4687601 |80064| R| |D|0127 | M|49998|0073458
DRAWING DATA=4687601 |80064| R| |D|0128 | H|49998|0054278
DRAWING DATA=4687601 |80064| R| |D|0129 | H|49998|0042489
DRAWING DATA=4687601 |80064| R| |D|0130 | H|49998|0061119
DRAWING DATA=4687601 |80064| R| |D|0131 | M|49998|0062671
DRAWING DATA=4687601 |80064| R| |D|0132 | M|49998|0047922
DRAWING DATA=4687601 |80064| R| |D|0133 | C|49998|0048603
DRAWING DATA=4687601 |80064| R| |D|0134 | M|49998|0051669
DRAWING DATA=4687601 |80064| R| |D|0135 | F|49998|0058301
DRAWING DATA=4687601 |80064| R| |D|0136 | M|49998|0053448
DRAWING DATA=4687601 |80064| R| |D|0137 | H|49998|0066456
DRAWING DATA=4687601 |80064| R| |D|0138 | D|49998|0050700
DRAWING DATA=4687601 |80064| R| |D|0139 | J|49998|0076293
DRAWING DATA=4687601 |80064| R| |D|0140 | M|49998|0067461
DRAWING DATA=4687601 |80064| R| |D|0141 | F|49998|0047019
DRAWING DATA=4687601 |80064| R| |D|0142 | D|49998|0046733
DRAWING DATA=4687601 |80064| R| |D|0144 | F|49998|0055396
DRAWING DATA=4687601 |80064| R| |D|0145 | M|49998|0046576
DRAWING DATA=4687601 |80064| R| |D|0146 | H|49998|0051786
DRAWING DATA=4687601 |80064| R| |D|0147 | H|49998|0052575
DRAWING DATA=4687601 |80064| R| |D|0148 | G|49998|0076155
DRAWING DATA=4687601 |80064| R| |D|0149 | F|49998|0061387
DRAWING DATA=4687601 |80064| R| |D|0150 | H|49998|0056537
DRAWING DATA=4687601 |80064| R| |D|0151 | K|49998|0078245
DRAWING DATA=4687601 |80064| R| |D|0152 | L|49998|0072314
DRAWING DATA=4687601 |80064| R| |D|0153 | H|49998|0052500
DRAWING DATA=4687601 |80064| R| |D|0154 | R|49998|0047911
DRAWING DATA=4687601 |80064| R| |D|0155 | F|49998|0065139
DRAWING DATA=4687601 |80064| R| |D|0156 | M|49998|0047837
DRAWING DATA=4687601 |80064| R| |D|0157 | J|49998|0081087
DRAWING DATA=4687601 |80064| R| |D|0158 | M|49998|0062164
DRAWING DATA=4687601 |80064| R| |D|0159 | F|49998|0064038
DRAWING DATA=4687601 |80064| R| |D|0160 | J|49998|0078510
DRAWING DATA=4687601 |80064| R| |D|0161 | M|49998|0064978
DRAWING DATA=4687601 |80064| R| |D|0162 | M|49998|0045190
DRAWING DATA=4687601 |80064| R| |D|0163 | H|49998|0048119
DRAWING DATA=4687601 |80064| R| |D|0164 | H|49998|0052450
DRAWING DATA=4687601 |80064| R| |D|0165 | H|49998|0050496
DRAWING DATA=4687601 |80064| R| |D|0166 | M|49998|0046088
DRAWING DATA=4687601 |80064| R| |D|0167 | H|49998|0042886
DRAWING DATA=4687601 |80064| R| |D|0168 | M|49998|0041160
DRAWING DATA=4687601 |80064| R| |D|0170 | M|49998|0072304
DRAWING DATA=4687601 |80064| R| |D|0171 | M|49998|0061827
DRAWING DATA=4687601 |80064| R| |D|0172 | M|49998|0075842
DRAWING DATA=4687601 |80064| R| |D|0173 | M|49998|0046474
DRAWING DATA=4687601 |80064| R| |D|0174 | F|49998|0056470
DRAWING DATA=4687601 |80064| R| |D|0175 | M|49998|0048177
DRAWING DATA=4687601 |80064| R| |D|0176 | M|49998|0043588
DRAWING DATA=4687601 |80064| R| |D|0177 | K|49998|0054414
DRAWING DATA=4687601 |80064| R| |D|0177.1 | J|49998|0086077
DRAWING DATA=4687601 |80064| R| |D|0178 | M|49998|0073061
DRAWING DATA=4687601 |80064| R| |D|0180 | M|49998|0084018
DRAWING DATA=4687601 |80064| R| |D|0181 | H|49998|0062150
DRAWING DATA=4687601 |80064| R| |D|0182 | H|49998|0048718
DRAWING DATA=4687601 |80064| R| |D|0184 | M|49998|0042573
DRAWING DATA=4687601 |80064| R| |D|0186 | F|49998|0069223
DRAWING DATA=4687601 |80064| R| |D|0187 | F|49998|0067952
DRAWING DATA=4687601 |80064| R| |D|0188 | F|49998|0067469
DRAWING DATA=4687601 |80064| R| |D|0189 | F|49998|0067980
DRAWING DATA=4687601 |80064| R| |D|0190 | F|49998|0067478
DRAWING DATA=4687601 |80064| R| |D|0191 | F|49998|0067017
DRAWING DATA=4687601 |80064| R| |D|0192 | F|49998|0069628
DRAWING DATA=4687601 |80064| R| |D|0193 | J|49998|0077341
DRAWING DATA=4687601 |80064| R| |D|0194 | M|49998|0065919
DRAWING DATA=4687601 |80064| R| |D|0195 | P|49998|0042426
DRAWING DATA=4687601 |80064| R| |D|0196 | J|49998|0045310
DRAWING DATA=4687601 |80064| R| |D|0197 | M|49998|0043564
DRAWING DATA=4687601 |80064| R| |D|0198 | H|49998|0043354
DRAWING DATA=4687601 |80064| R| |D|0200 | M|49998|0045836
DRAWING DATA=4687601 |80064| R| |D|0201 | K|49998|0067256
DRAWING DATA=4687601 |80064| R| |D|0202 |F1|49998|0074309
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01|
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130215|A| | |
3. REQUIREMENTS
3.1 ;The .25 IPS Elbow must be made in accordance with NAVSEA drawing 4687601 piece 124A, except as amplified or modified herein.;
3.2 Extra Dimensions for Elbows -
A. All Elbows - All elbows must have 1/2 inch minimum straight tangents added to the center to end dimensions.
B. Nonstandard pipe sizes (7 and 9 inch NPS) - The center to end dimensions of the next larger size may be used or the center to end dimensions may be interpolated from the next larger and next smaller standard size. (1/2 inch minimum straight tangents must
be added to this dimension)
3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;Elbow;
Material - ;QQ-S-763 class 304 cond. A;
3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining)
Item - ;Elbow;
Performance - SAE-AMS-QQ-S-763
Acceptance - SAE-AMS-QQ-S-763
Test - ;Dye Penetrant Inspection;
Item - Each Item
Performance - T9074-AS-GIB-010/271
Acceptance - Wrought: MIL-STD-2035 / Forgings: "Quality Statement For The Procurement Of Forgings)
Attribute - Certificate of Compliance for seamless tubing/pipe
Item - ;Elbow;
Performance - Material supplied must be in the seamless condition.
3.5 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications,
or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be
submitted for review and approval prior to performing any welding or brazing.
3.6 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a
copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.7.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.
3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.9 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.9.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.10 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.11 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4
3.11.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.11.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.11.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.11.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify
the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA)
Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.11.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.12 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.12.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices and for verification of their accuracy and condition.
3.12.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.13 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.13.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.13.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.13.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.13.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be
established. Records of this effort must be available for review by the government.
3.13.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.14 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.14.1 Visual examination upon receipt to detect damage during transit.
3.14.2 Inspection for completeness and proper type.
3.14.3 Verification of material quality received.
3.14.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.14.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.14.6 Identification and protection from improper use or disposition.
3.14.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.14.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.14.9 Material returned to the contractor must be handled as GFM.
3.15 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.15.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.16 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must
provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of
operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.16.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.16.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.16.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ;
3.17 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.17.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the
material supplied.
3.17.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or
mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used
during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material
must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the
original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.17.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and
contract requirements. Transcription of certification data is prohibited.
3.17.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.17.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.18 Material Handling - The written material control process must include the following:
3.18.1 All raw materials must have traceability markings (except as specified below).
3.18.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.18.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.18.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.18.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.18.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking
location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.19 Receiving inspection -
3.19.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to
another location.
3.19.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.20 Discrepancy reporting -
3.20.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to
the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR).
3.21 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.21.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military
specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code),
table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.21.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the
Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.21.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification
test reports must also be 100% inspected for completeness and legibility.
3.21.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.
3.22 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.22.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.22.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted,
citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'')
3.22.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the
contract.
3.22.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including
size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure
Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.22.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.22.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted
as part of the qualification data.
3.22.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential
elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.22.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.22.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.
3.22.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.
3.22.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.22.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.23 Quality Statement for the Procurement of Forgings - The forgings must be free of scale and machining burrs.
A. All accessible surfaces of the finished forging must be magnetic particle or liquid penetrant inspected (as required by the contract/purchase order) in accordance with T9074-AS-GIB-010/271. Indications obtained by the inspection must be evaluated and must
be free of injurious imperfections as defined below:
Depth of Injurious Imperfections - Linear imperfections must be explored for depth. When the depth encroaches on the minimum wall thickness of the finished forging, such imperfection must be considered injurious.
Any imperfection located in gasket, bearing or machined surfaces which can cause leakage or otherwise interfere with proper function of the component(s).
B. Machining or Grinding Imperfections not Classified as Injurious - Surface imperfections not classified as injurious must be treated as follows:
Seams, laps, tears or slivers, not deeper than 5 percent of the nominal wall thickness or 1/16 inch (1.6MM), whichever is less.
Mechanical marks or abrasions and pits must be acceptable, without grinding or machining, provided the depth does not exceed the limitations set forth in para A above. Imperfections that are deeper than 1/16 inch (1.6MM), but which do not encroach on the
minimum wall thickness of the forgings must be removed by grinding to sound metal.
When imperfections have been removed by grinding or machining, the outside dimension at the point of grinding or machining may be reduced by the amount removed. Should it be impractical to secure a direct measurement, the wall thickness at the point of
grinding or at an imperfection not required to be removed, must be determined by deducting the amount removed by grinding from the nominal finished wall thickness of the forging and the remainder must be not less than the minimum specified or required wall
thickness.
C. Surface conditions noted in paragraph B above, must be considered acceptable without weld repair provided the grinding is blended smoothly with the adjacent material and is scattered and provided the total ground area does not exceed 10 percent of the
forging surface. All ground areas must be reinspected by magnetic particle or liquid penetrant inspections (as required by the contract/purchase order).
D. Injurious imperfections and defect excavations which violate the minimum required wall thickness may be weld repaired in accordance with S9074-AR-GIB-010A/278. Authority for the repair of wrought or forged material must be obtained from the Procurement
Contracting Officer. This request must be submitted on a DD Form 1694 describing the defect, including size, depth, and location. This request must also include a description of the proposed repair.
E. All weld repaired areas must be inspected by magnetic particle or liquid penetrant inspection. Acceptance criteria must be in accordance with S9074-AR-GIB-010A/278.
3.24 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed
satisfactorily.
9. Contractor's or authorized personnel's signature.
4. QUALITY ASSURANCE
4.1 Notes to DCMA QAR and the Contractor -
4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a
disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition.
4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A
record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO.
4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements.
4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders.
4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at:
https://register.nslc.navy.mil/
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item.
6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS.
6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the
ship, or unacceptable risk of personal injury or loss of life.
6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a
critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation).
6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements.
6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's
commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program.
6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the
Contracting Agency as important, are observed and evaluated.
6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initia