East Campus LOT 12 (Riverbank Park)
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
General Information
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Mar 25, 2024 05:39 pm EDT
- Original Response Date: Apr 08, 2024 03:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Apr 23, 2024
- Initiative:
- None
Classification
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
- NAICS Code:
- 236220 - Commercial and Institutional Building Construction
- Place of Performance: MD 20755USA
Description
This is a Prequalification of Sources Notice, in accordance with the procedures authorized by DFARS 236.272, for the East Campus Riverbank Park (Lot 12) Project. The U.S. Army Corps of Engineers (USACE) Baltimore District will solicit offers for a Firm Fixed Price Design Bid Build contract in support of the Maryland Procurement Office (MPO), Ft. Meade, MD. The East Campus Lot 12 (Riverbank Park) will be an outdoor park destination with a variety of interwoven passive and active landscape experiences. The development shall include features such as a perimeter walking/jogging path, events lawn with restroom facilities, food truck and farmers market staging area, integrated storage area, and other similar features. The Lot 12 supporting facilities include site preparation for infrastructure features such as general site circulation, storm water management, lighting and landscaping features that are integrated within the existing East Campus. Improvements will include new or expansion of existing utility services and distribution systems. Site preparation work will include standard clearing/grubbing, cut/fill and grading, and erosion and sediment control measures. The purpose of the park space is to support workforce wellness, increase collaboration opportunities and enhance workforce engagement. The period of performance for this work is approximately 16 months.
The project includes tie-in to existing campus utilities. The contractor may need to coordinate work with Baltimore Gas and Energy Utility company that would be undertaking the relocation of an existing gas line on site. The contractor will also be required to coordinate their work with other active projects and with the personnel responsible for the stakeholder’s ongoing mission operations within the secured East Campus.
The Prequalification for this acquisition will be open to all interested small business owners/contractors.
Attachments/Links
Contact Information
Contracting Office Address
- RESOURCE MANAGEMENT OFFICE 2 HOPKINS PLAZA
- BALTIMORE , MD 21201-2526
- USA
Primary Point of Contact
- Erica A. Eaton
- Erica.A.Eaton@usace.army.mil
Secondary Point of Contact
- Patricia Morrow
- patricia.l.morrow@usace.army.mil
History
- Apr 23, 2024 11:55 pm EDTSpecial Notice (Updated)
- Mar 25, 2024 05:39 pm EDTSpecial Notice (Original)