Building 56 RAF Fairford - Furnishing Supply and Installation
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Dec 19, 2023 10:41 am GMT
- Original Response Date: Jan 02, 2024 02:00 pm GMT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jan 17, 2024
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: 7110 - OFFICE FURNITURE
- NAICS Code:
- 33721 - Office Furniture (including Fixtures) Manufacturing
- Place of Performance: GL7 4DLGBR
Description
This is a Sources Sought notice not a Request for Quote at this time.
The purpose of this Sources Sought is to identify vendors that are able to fulfil the below requirement, as detailed in the attached statement of objectives.
The 420 ABS has a requirement for design, supply and installation of office furniture to support the move of Logistics Readiness staff to Building 56 at RAF Fairford to accommodate the following basic features:
- (6) Workstations into the office areas: (3) in "glassed offices" & (3) in "small walled office" (SIPR Room)
- (4) Cubicle offices with privacy doors; each would measure approximately 12 foot x 12 foot (~7 foot walls)
- (14) Cubical work stations; each cubical would measure approximately 8 foot x 8 foot (~5 foot walls)
- (1) Conference room that can accommodate up to 40 personnel (~7 foot walls)
- (2) Breakout rooms that can accommodate up to (6) personnel each (~7 foot walls)
The modular furniture design should be ergonomic in nature while maximizing natural light and minimizing background noise. The proposal should consider the following factors: existing communications drops, electrical outlets, air conditioning vents and sprinkler heads.
A site visit will be conducted; this is provisionally scheduled for 16 January 2024.
Attachments/Links
Contact Information
Contracting Office Address
- (ADMIN ONLY NO REQTN) UNIT 5720
- APO , AE 09470-5720
- USA
Primary Point of Contact
- Stephannie Dunn
- stephannie.dunn.gb@us.af.mil
- Phone Number 441480843099
Secondary Point of Contact
- Lawrence Roman
- lawrence.roman.gb@us.af.mil
- Phone Number +441480843925
History
- Apr 05, 2024 04:55 am BSTCombined Synopsis/Solicitation (Original)
- Jan 18, 2024 04:55 am GMTSources Sought (Original)
- Jan 05, 2024 03:30 pm GMTCombined Synopsis/Solicitation (Original)