Building 34 Chiller Replacement
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Feb 01, 2024 09:57 am EST
- Original Published Date: Jan 25, 2024 02:03 pm EST
- Updated Date Offers Due: Feb 26, 2024 02:00 pm EST
- Original Date Offers Due: Feb 26, 2024 02:00 pm EST
- Inactive Policy: Manual
- Updated Inactive Date: Jan 24, 2025
- Original Inactive Date: Jan 24, 2025
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Z2AZ - REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- NAICS Code:
- 236220 - Commercial and Institutional Building Construction
- Place of Performance:
Description
02/01/2024: Amendment 0001 has been posted, please see attachment on PIEE website. See link below.
01/25/2024: The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chiller, cooling tower, and pumps located in two mechanical rooms adjacent to the building entrance and replace with a similar capacity air cooled chiller with supporting equipment (pumps, expansion tanks, piping system, air separators, etc.) and new electrical infrastructure support (feeder and branch circuit, disconnect switches etc.) extending from B34 to new equipment. The existing diesel generator will be demolished and replaced with a new natural gas generator with Automatic Transfer Switch (ATS) to support back-up operation.The air cooled chiller will be placed outdoor in the outdoor equipment area adjacent to the mechanical room. Existing electrical infrastructure to be demolished along with the existing equipment removed. Minor modification to the building structure/site work will be needed to allow removal of existing equipment and installation of new equipment in mechanical rooms and outdoor equipment yard including but not limited to: capping roofing penetrations after cooling tower is removed, wall demolition and new work, removing existing concrete equipment pads, and new underground gas piping for gas generator.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING OFFICE 803 FRONT STREET
- NORFOLK , VA 23510-1096
- USA
Primary Point of Contact
- JACK BASS
- jack.b.bass@usace.army.mil
- Phone Number 757-201-7385
Secondary Point of Contact
- Nicholas Lizotte
- nicholas.lizotte@usace.army.mil
- Phone Number 757-201-7310
History
- Feb 26, 2025 11:55 pm ESTSolicitation (Updated)
- Mar 06, 2024 02:26 pm ESTSolicitation (Updated)
- Feb 27, 2024 11:00 am ESTSolicitation (Updated)
- Feb 23, 2024 01:09 pm ESTSolicitation (Updated)
- Feb 21, 2024 04:16 pm ESTSolicitation (Updated)
- Feb 15, 2024 03:51 pm ESTSolicitation (Updated)
- Feb 07, 2024 07:58 am ESTSolicitation (Updated)
- Feb 01, 2024 10:00 am ESTSolicitation (Updated)
- Feb 01, 2024 09:57 am ESTSolicitation (Updated)
- Jan 25, 2024 02:03 pm ESTSolicitation (Original)