Y1DA--FY23: NRM-Tier 1 (PROJ: 548-23-122) D/B Install Additional Pump on OR Chilled Water Loop

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: May 26, 2023 02:39 pm EDT
  • Original Published Date: Nov 16, 2022 04:35 pm EST
  • Updated Date Offers Due: Dec 20, 2023 02:00 am EST
  • Original Date Offers Due: Dec 08, 2022 05:00 pm EST
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 31, 2023
  • Original Inactive Date: Dec 23, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    FL 33410
    USA

Description

Award Announcement Attached, 36C24823C0052

This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Businesses (SDVOSB).  POP is 120 Days from NTP.

AMENDMENT 3 - RFI Responses & Attachments provided; Proposal Due Date extended to Dec 20, 2022 at 2:00 PM EST.

AMENDMENT 2 - P1 Due Date extended to Dec 13, 2022 at 12:00 PM EST; P1 Site Visit Sign In Sheet Provided.

AMENDMENT 1 - Change to Site Visit and RFI dates. See attachment titled "S06 36C24823R0051 0001".

The contractor shall provide all labor, tools, and materials necessary for the following work: Install new pump on existing OR chilled water loop. The pump will match existing and will be installed in parallel with the two (2) existing pumps. Pumping capacity will be designed to carry full load. Control configuration will allow either of the three (3) pumps to act as the primary. Install new Eaton VFD for the new pump. The new VFD will match existing and will be located adjacent to the (2) existing pump VFDs. New VFD to have manual disconnect. The power feed to the two (2) existing pumps will be rewired by the contractor so that the pumps are not on the same electrical panel. New DDC controls with BACNET communication. Contractor shall use our installed BACnet compatible building automation system (BAS) for this project. Contractor shall provide all engineering and technical assistance required for integration into BAS. All devices installed shall be BACnet tested and approved and work seamlessly with existing BAS.