ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208A Am.2 - or - ISO 9001 NCSL Z540.3 - or - ISO 10012 |
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
PRODUCTION LOT TESTING|1|30 |
TIME OF DELIVERY (JUNE 1997)|20|DATA ITEM A001, DATA ITEM A002, & DATA ITEM A003|ONE EACH |45|Data Item A004|ONE |195 |Data Item A005|ONE|375 |DATA ITEM A006, DATA ITEM A007, DATA ITEM A008, DATA ITEM A009, DATA ITEM A00A |ONE EACH|525|CLIN 0001AA & CLIN 0001AB|5
6 EACH 55 EACH|585||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|W25G1U / W62G2T|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS-N00104|
VALUE ENGINEERING (JUN 2020)|3||||
EQUAL OPPORTUNITY (SEP 2016)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4||X|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1 each of 2 specimens as noted in the TDP|0001|15|195 days (specimen 1) & 375 days (specimen 2)|N64498 - Naval Surface Warfare Center, Philadelphia Division (NSWCPD), Attn: Matthew Ogilvie, via PIEE/WAWF, (
include email matthew.ogilvie@navy.mil on submittal)|TBD|0001|30|||
PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010)|4|||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|X|X|||X||||||||X|
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|335931|500|X|X|X|||||||||
INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2|||
TYPE OF CONTRACT (APR 1984)|1|FIRM FIXED PRICE|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
EVALUATION OF FIRST ARTICLE TESTING|3|||X|
Amendment is being issued to update the TDP to Version 081 as shown in the following pages.
The change removes paragraph 6.4 under the Notes Section which stated:
6.4 ;Storage crates (8603581-1) will not be provided as Government Furnished Material. Awardee will need to manufacture (8603581-1) and/or have manufactured in accordance with NAVSEA drawing number 8603581. ;
THE STORAGE CRATES WILL NOW BE PROVIDED AS GOVERNMENT FURNISHED PROPERTY (GFP) AND THE VENDOR WILL NOT BE REQUIRED TO INCLUDE THEIR COST IN THEIR PRICING PROPOSALS.
The solicitation closing date is extended to 23 June 2023 to allow for proposal updates.
All other terms and conditions remain unchanged.
This amendment is being issued to make the following changes:
1) Page 2, SOLICIATION NOTES is revised to state "This solicitation is for the procurement of new Cable Assemblies, Spec";
2) Incorporate DFARS 252.225-7007 & 252.225-7009 as shown below;
3) Revise FAR 52.211-8 as shown below;
4) For clarification: In accordance with SUPTXT215-9401 (6-03) - EVALUATION OF FIRST ARTICLE TESTING (page 60-61 of the RFP), vendors should include price with First Article Testing and price without First Article Testing.
All other terms and conditions remain unchanged.
\
This solicitation is for the procurement of new material.
Proposals submitted via NECO are not acceptable. Vendors must complete, sign and return a copy of the RFP by including it as an attachment to an email directed to the Contract Specialist at tonya.l.nearhood.civ@us.navy.mil.
Inspection of material will be at:
_____________________________________________________________________
Inspection of packaging and final acceptance of material will be at:
______________________________________________________________________
This procurement includes DD1423 Contract Data Requirements with 2 distinct First Article Tests as well as 100% Production Lot Test as noted in the TDP. Please ensure your proposal encompasses all aspects of the procurement.
Item 21 and Item 22 on drawing 5361667 are manufactured by TE Connectivity who bought out Rochester. These parts are not obsolete and any potential vendor can get them from TE Connectivity with the following information:
Item 21 - NIIN 01-221-1717, Manufacturer P/N MSS-L12-CCP
Item 22 - NIIN 01-221-0694, Manufacturer P/N MSS-K12-CCP
For AN/BRR-6 Tow Cable Shipping/Storage Box Vendor Operating Procedures refer to drawing 8628341.
Storage crates (8603581-1) will not be provided as Government Furnished Material. Awardee will need to manufacture (8603581-1) or have it manufactured in accordance with NAVSEA drawing number 8603581.
All contractual documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders and Modifications) related to the instant procurement are considered to be "Issued" by the Government when copies are either deposited in the mail, transmitted by Facsimile,
or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "Issue" contractual documents as detailed herein.
Any contract resulting from this solicitation will be issued bi-laterally requiring the contractor's written acceptance prior to execution.
\
1. SCOPE
1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRR-6 Tow Cable Assembly; for use on Navy submarines.;
"The tow cable container (identified by NSN 7G-8145-01-670-2197) will be provided as Government Furnished Material. Containers will be forwarded to the raw cable supplier as needed. The raw cable required for the fabrication of both first article
specimens may be ordered concurrently. The contractor does not have authorization to order production lot raw cable prior to first article approval of both first article specimens. The ordering of production lot cable prior to first article approval will be
at the contractor's risk and no government furnished containers will be provided to facilitate storage."
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.2 The "Document Changes" section provides supersessions/changes to referenced documents.
2.1.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,
however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
DRAWING DATA=0064-0010 |25685| F| |D|0001 | F|49998|0020929
DRAWING DATA=0064-0010 |25685| F| |D|0002 | F|49998|0027197
DRAWING DATA=0064-0010 |25685| F| |D|0003 | F|49998|0026558
DRAWING DATA=0064-0010 |25685| F| |D|0004 | F|49998|0040291
DRAWING DATA=0064-0010 |25685| F| |D|0005 | F|49998|0045316
DRAWING DATA=0064-0010 |25685| F| |D|0006 | F|49998|0040372
DRAWING DATA=0064-0010 |25685| F| |D|0007 | F|49998|0032791
DRAWING DATA=0064-0010 |25685| F| |D|0008 | F|49998|0035465
DRAWING DATA=0064-0010 |25685| F| |D|0009 | F|49998|0038278
DRAWING DATA=0064-0010 |25685| F| |D|0010 | F|49998|0042747
DRAWING DATA=0064-0010 |25685| F| |D|0011 | F|49998|0042502
DRAWING DATA=0064-0010 |25685| F| |D|0012 | F|49998|0040695
DRAWING DATA=0064-0010 |25685| F| |D|0013 | F|49998|0019434
DRAWING DATA=0064-0010 |25685| F| |D|0014 | F|49998|0008684
DRAWING DATA=0064-0010 |25685| F| |D|0015 | F|49998|0006929
DRAWING DATA=0064-0020 |25685| K| |D|0001 | K|49998|0016148
DRAWING DATA=0064-0020 |25685| K| |D|0002 | K|49998|0017917
DRAWING DATA=0064-0020 |25685| K| |D|0003 | K|49998|0016064
DRAWING DATA=0064-0020 |25685| K| |D|0004 | K|49998|0026214
DRAWING DATA=0064-0020 |25685| K| |D|0005 | K|49998|0032578
DRAWING DATA=0064-0020 |25685| K| |D|0006 | K|49998|0026699
DRAWING DATA=0064-0020 |25685| K| |D|0007 | K|49998|0019012
DRAWING DATA=0064-0020 |25685| K| |D|0008 | K|49998|0027036
DRAWING DATA=0064-0020 |25685| K| |D|0009 | K|49998|0023613
DRAWING DATA=0064-0020 |25685| K| |D|0010 | K|49998|0026140
DRAWING DATA=0064-0020 |25685| K| |D|0011 | K|49998|0031273
DRAWING DATA=0064-0020 |25685| K| |D|0012 | K|49998|0029980
DRAWING DATA=0064-0020 |25685| K| |D|0013 | K|49998|0005898
DRAWING DATA=0064-0020 |25685| K| |D|0014 | K|49998|0176355
DRAWING DATA=0064-0020 |25685| K| |D|0015 | K|49998|0251724
DRAWING DATA=0064-0020 |25685| K| |D|0016 | K|49998|0400018
DRAWING DATA=5361667 |53711| M| |D|0001 | M|49998|1354998
DRAWING DATA=8628121 |53711| -| |D|0001 | -|49998|0080399
DRAWING DATA=8628131 |53711| A| |D|0001 | |49998|0187143
DRAWING DATA=8628134 |53711| A| |D|0001 | |49998|0109372
DRAWING DATA=8628341 |53711| -| |D|0001 | |49998|3102876
DOCUMENT REF DATA=MIL-STD-97 | | | |000930|A| |04|
DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01|
DOCUMENT REF DATA=ISO 9001 | | | |150915|A| | |
DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | |
DOCUMENT REF DATA=SAE-AMS-P-21922 | | |A |161002|A| | |
DOCUMENT REF DATA=MIL-M-24041 | | |C |810817|A| | |
DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |951103|A|2 | |
DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | |
DOCUMENT REF DATA=ASTM A240/A240M | | | |191201|A| | |
DOCUMENT REF DATA=ASME B46.1-2009 | | | | |A| | |
DOCUMENT REF DATA=SAE-AMS-QQ-S-763-AUG 13 | | |D | |A| | |
DOCUMENT REF DATA=SAE-AS3578 - 05/1996 | | | | |A| | |
DOCUMENT REF DATA=NSWCCD-SSES SPEC 0064-0010 | | |F |000128|A| | |
DOCUMENT REF DATA=NSWCCD-SSES SPEC 0064-0020 | | |K |090913|A| | |
DOCUMENT CHANGE DATA=ASTM A240 |ASTM A240/A240M-2019
DOCUMENT CHANGE DATA=MIL-C-24231D |MIL-DTL-24231E
DOCUMENT CHANGE DATA=MIL-P-21922B |SAE-AMS-P-21922A
3. REQUIREMENTS
3.1 ;Design and Manufacturing - The ;AN/BRR-6 Tow Cable Assembly; furnished under this contract/purchase order shall meet the material, electrical, physical, mechanical and test requirements as specified on Drawing 5361667 consisting of Item Numbers (1 thru
5, 7, 9, 11, 12, 14, 15, 17, 18, 21 thru 24, 263, 264 & 265), NSWCCD-SSES Specifications 0064-0010 and 0064-0020 including associated specifications mentioned in this procurement. ;
3.1.1 ;Source Control Item - Tow Cable p/n 5361667-3 per Specification 0064-0010 shall only be manufactured by and procured from Rochester Company.;
3.1.2 ;The Polyurethane Molding Compound shall be in accordance MIL-M-24041 as specified on drawing p/n 5361667-12, and the color shall be amber or clear as stated on the drawing.;
3.1.3 ;The finished cable assembly p/n 5361667-1 length shall be 1500 +10/-10 feet as specified in Specification 0064-0020 paragraph 3.3.;
3.2 ;First Article Cable Test/Inspection Specimen - The supplier shall fabricate, inspect and test two (2) first article cable assemblies as defined in NSWCCD-SSES Specification 0064-0020, Paragraph 3.6.1 and Note. ;
3.2.1 ;The first cable specimen (destructive testing) shall be a ;Tow Staff and Molded Connector Assembly; constructed of at least 10-foot length of tow cable p/n 5361667-3 to be terminated into tow staff p/n 5361667-5 and molded to the connector p/n
5361667-22; and inspected and tested to destruction as specified in NSWCCD-SSES Specification 0064-0020, paragraphs 3.6.1 and Note, 3.6.3.2, 3.6.3.3/4.1.1.3, 3.6.4.6 and 3.6.4.7.;
3.2.2 ;The second cable specimen (nondestructive testing) shall be one (1) completed ;Tow Cable Assembly; p/n 5361667-1 for nondestructive testing and inspection as specified in NSWCCD-SSES Specification 0064-0020, paragraph 3.6.1 and Note, 3.6.3.1, 3.6.3.2,
3.6.4.1 thru 3.6.4.5 and 3.6.4.7.;
3.2.3 ;The supplier shall successfully perform and pass all test and inspection requirements for the first cable specimen ;Tow Staff and Molded Connector Assembly; before being authorized by the Procuring Activity to commence the fabrication, armor
termination, assembly, testing and inspection of the second cable specimen a complete ;Tow Cable Assembly; p/n 5361667-1 for nondestructive testing and inspection.;
3.3 ;Marking Requirements.;
3.3.1 ;The supplier shall ensure the ;Tow Cable; p/n 5361667-3 is properly identified as specified in paragraph 5.1 of Specification 0064-0010.;
3.3.2 ;The supplier shall permanently mark the first article cable specimen ;Tow Staff and Molded Connector Assembly; with contract and assembly serial number per MIL-STD-130. ;The supplier shall establish, control and assign serial number for this
assembly.; ;
3.3.3 ;The supplier shall permanently mark and identify the first article and each production lot unit ;Tow Cable Assembly; p/n 5361667-1 in accordance with Note 26 (1 thru 4) of the drawing. The supplier shall mark ;tag or bag; each assembly with contract
number and assembly serial number per MIL-STD-130. ;The supplier shall establish, control and assign serial number for each assembly.; ;
3.3.4 ;The supplier shall mark ;tag or bag; each p/n 5361667-5, 7 and 9 with contract, drawing/item, heat, lot and serial number per MIL-STD-130 until installed in the designated assembly.;
3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing /inspection procedure and approval are required for both specimens ;Tow Staff and Molded Connector Assembly; and ;Tow Cable Assembly; p/n 5361667-1. Government
approval isrequired prior to commencing of the first article.;
3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.;
3.5.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.;
3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,
Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original
and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until
another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,
the date of the granting of the authorization, and the name of the granting authority.
Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.
The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.
Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.
3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material
will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The
contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting
Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of
contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are
located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a
polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the
requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a
component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface
ship atmosphere.
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any
inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance
does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during
the performance of the contract and for a period of four years after final delivery of supplies.
4.4 ;Vendors may utilize MIL-I-45208A Am.2 in lieu of ISO 9001 and NCSL Z540.3 in lieu of ISO 10012.;
4.5 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the
Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract.
CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110;
4.6 ;Surface Roughness - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.;
4.7 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.;
4.8 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for first
article and production units. If the material is subsequently heat-treated a certification of physical analysis, after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (e.g. corrosion
resistance test, m acro-etch test) these test results shall also be reported on the applicable mill or industrial laboratory report. The physical analysis shall establish the following properties for metallic parts: Ultimate Tensile Strength, Yield Strength and
Elongation.;
4.9 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on both specimens ;Tow Staff and Molded Connector Assembly; and ;Tow Cable Assembly; p/n 5361667-1 in accordance with Drawing
5361667 and NSWCCD-SSES Specification 0064-0020, and their approved first article procedure.;
4.10 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an
NSWCPD representative has the option of being present during the first article testing/inspection.;
4.11 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure for both first article specimens ;Tow Staff and Molded
Connector Assembly; and ;Tow Cable Assembly; p/n 5361667-1 in accordance with the requirements of DI-NDTI-80603, Drawing 5361667, NSWCCD-SSES Specification 0064-0020, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval
of the procedure is required prior to commencement of first article.
CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A;
4.12 ;First Article Testing ;Tow Staff and Molded Connector Assembly; - The supplier shall perform 100% examination, inspection and testing on the first article specimen (component parts/assembly) in accordance with Drawing 5361667 and NSWCCD-SSES Spec
0064-0020, paragraphs 3.6.1 and Note, 3.6.3.2, 3.6.3.3/4.1.1.3, 3.6.4.6 and 3.6.4.7, and their approved first article procedure. The supplier shall record the actual measurements results of each examination, inspection and test in Spec 0064-0020, and each
dimension identified on the applicable drawing.;
4.13 ;The supplier shall visually and physically inspect 100% the tow staff p/n 5361667-5 each dimension identified on drawing 5361667; and shall verify all internal surfaces have been sand blast per Note 10 of the drawing. ;
4.14 ;The supplier shall inspect 100% the armor wires for a minimum of 63 micro finish specified in Spec 0064-0020, paragraphs 3.6.3.2 and 4.1.1.2a. prior to embedding into the epoxy and terminating the tow cable to the tow staff.;
4.15 ;The supplier shall perform 100% hardness testing on the cured epoxy specified in Spec 0064-0020, paragraph 3.6.3.2, and shall meet the hardness requirements specified in Spec 0064-0020, paragraph 4.1.1.2b.;
4.16 ;The supplier shall perform 100% hardness testing on the cured polyurethane molding in accordance with Spec 0064-0020, paragraphs 3.4.6, 3.6.4.7 and 4.1.1.2c, and shall have a hardness value of Shore A 70 to 92 per Spec 0064-0020, paragraph 4.1.1.2c.;
4.17 ;The supplier shall visually inspect 100% the molded connector p/n 5361667-22 on ;Tow Staff and Molded Connector Assembly; specified in Spec 0064-0020, paragraphs 3.4.6 and 3.6.4.7 and MIL-DTL-24231, paragraph 3.4.3.;
4.18 ;The supplier shall perform 100% nondestructive bonding test on molded connector p/n 5361667-22 on ;Tow Staff and Molded Connector Assembly; specified in Spec 0064-0020, paragraphs 3.4.6, 3.6.4.7 and 4.1.2.7 in accordance with MIL-DTL-24231 paragraph
4.5.6.1.;
4.19 ;The supplier shall perform 100% destructive bonding test on molded connector p/n 5361667-22 on ;Tow Staff and Molded Connector Assembly; specified in Spec 0064-0020, paragraphs 3.4.6, 3.6.4.6 and 4.1.2.6 in accordance with MIL-DTL-24231 paragraph
4.5.6.2.;
4.20 ;The supplier shall measure and record the tow cable and overall tow staff and molded connector assembly length prior to any destructive testing.;
4.21 ;The supplier shall perform 100% strength testing (destructive) on ;Tow Staff and Molded Connector Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.3.3 and 4.1.1.3. The tow staff assembly shall be tensile tested to failure and must withstand
a minimum of 9500lbs of tension as specified in Spec 0064-0020, paragraph 4.1.1.3.;
4.22 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for the first article test specimen ;Tow Staff and Molded Connector Assembly; testing/inspection reports in compliance with the
requirements of DI-NDTI-80603, Drawing 5361667 and NSWCCD-SSES Specification 0064-0020, paragraphs 3.6.1 and Note, 3.6.3.2, 3.6.3.3/4.1.1.3, 3.6.4.6 and 3.6.4.7. The report shall also include a copy of ;Mill Certification (Dwg Item No. 5); Certificate of
Conformance for (Dwg Item Nos. 11, 12, 14, 17, 22, 263, 264 & 265), Passivation Treatment (for Dwg Item No.5 per dwg note 12); Visual/Dimensional Inspection Report (for Dwg Item No. 5); as indicated on the Contract Data Requirements List (DD Form 1423).
Government approval of the first article testing/inspection report is required for the first specimen prior to authorization and commencement of the second first article test specimen complete ;Tow Cable Assembly;p/n 5361667-1.
CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B;
4.23 ;First Article Testing ;Tow Cable Assembly P/N 5361667-1; - The supplier shall perform 100% examination, inspection and testing on the second completed first article specimen (tow cable/component parts/assembly) in accordance with Drawing 5361667,
NSWCCD-SSES Specifications 0064-0010, paragraph 5 and 0064-0020, paragraphs 3.6.1 and Note, 3.6.3.1, 3.6.3.2, 3.6.4.1 thru 3.6.4.5 and 3.6.4.7, and their approved first article procedure. The supplier shall record the actual measurements and results of each
examination, inspection and test in Specification 0064-0020, and each dimension identified on the applicable drawing. ;
4.24 ;The supplier shall inspect ;Tow Cable; p/n 5366167-3 upon receipt for compliance with the Preparation for Delivery requirements specified in Spec 0064-0010, paragraph 5.;
4.25 ;The supplier shall visually and physically inspect 100% each component part p/n 5361667-5, 7 and 9 each dimension identified on Drawing 5361667, and shall verify p/n 5361667-5 and 7 all internal surfaces have been sand blast per Note 10 of the drawing.;
4.26 ;The supplier shall inspect 100% the armor wires for a minimum of 63 micro finish specified in Spec 0064-0020, paragraphs 3.6.3.2 and 4.1.1.2a. prior to embedding into the epoxy and terminating the tow cable to the tow staff and grip.;
4.27 ;The supplier shall perform 100% hardness testing on the cured epoxy specified in Spec 0064-0020, paragraph 3.6.3.2, and shall meet the hardness requirements specified in Spec 0064-0020, paragraph 4.1.1.2b.;
4.28 ;The supplier shall visually and physically inspect 100% the completed ;Tow Cable Assembly; p/n 5361667-1 each dimension and keyway location/position identified on Drawing 5361667 including the identification and markings required by Note 26 (1 thru 4)
of the drawing.;
4.29 ;The supplier shall visually inspect 100% the molded connectors p/n 5361667-21 and 22, tow staff p/n 5361667-5, grip p/n 5361667-7 and tubing p/n 5361667-263 on the completed ;Tow Cable Assembly; specified in Spec 0064-0020, paragraphs 3.4.6 and
3.6.4.7 in accordance with MIL-DTL-24231, paragraph 3.4.3.;
4.30 ;The supplier shall ensure the hardness value of the cured polyurethane molding on the completed ;Tow Cable Assembly; have meet the requirements of Spec 0064-0020, paragraphs 3.6.4.7 and 4.1.1.2.;
4.31 ;The supplier shall perform 100% nondestructive bonding test on molded connectors p/n 5361667-21 and 22 on the completed ;Tow Cable Assembly; specified in Spec 0064-0020, paragraphs 3.4.6, 3.6.4.7 and 4.1.2.7 in accordance with MIL-DTL-24231, paragraph
4.5.6.1.;
4.32 ;The supplier shall perform 100% hydrostatic pressure test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.3.1 and 4.1.1.1.;
4.33 ;The supplier shall perform 100% insulation resistance test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.1 and 4.1.2.1.;
4.34 ;The supplier shall perform 100% dielectric withstanding voltage test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.2 and 4.1.2.2.;
4.35 ;The supplier shall perform 100% D. C. resistance test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.3 and 4.1.2.3.;
4.36 ;The supplier shall perform 100% capacitance test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.4 and 4.1.2.4.;
4.37 ;The supplier shall perform 100% RF loss test on the completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.5 and 4.1.2.5 and their approved RF procedure.;
4.38 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for the second first article specimen completed ;Tow Cable Assembly; testing/inspection reports in compliance with the requirements of
DI-NDTI-80603, Drawing 5361667, NSWCCD-SSES Specifications 0064-0010, paragraph 5 and 0064-0020, paragraphs 3.6.1 and Note, 3.6.3.1, 3.6.3.2, 3.6.4.1 thru 3.6.4.5 and 3.6.4.7. The report shall also include a copy of ;Tow Cable Test/Inspection Report p/n
5361667-3; Mill Certification (Dwg Item Nos. 5, 7 & 9); Certificate of Conformance for (Dwg Item Nos. 2, 4, 11, 12, 14, 15, 17, 18, 21 thru 24, 263, 264 & 265), Passivation Treatment (for Dwg Item Nos. 5, 7 & 9 per dwg note 12); Visual/Dimensional Inspection
Report; as identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to
commencement of production units.
CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B ;
4.39 ;Production Lot.;
4.40 ;Tow Cable P/N 5361667-3 - The supplier shall perform 100% examination, inspection and testing on each ;Tow Cable; in accordance with the requirements listed in NSWCCD-SSES Specification 0064-0010, paragraphs 3.5, 3.5.1, 3.5.1.2 thru 3.5.3, 3.5.3.2,
3.5.3.4, 3.5.3.5, 3.5.4 thru 3.5.4.5, 4.3 thru 4.9, 4.11, 4.12. 4.14 thru 4.22 and 5. The supplier shall record the actual measurements and results of each examination, inspection and test specified in Spec 0064-0010.;
4.41 ;Tow Cable Assembly P/N 5361667-1) - The supplier shall perform 100% examination, inspection and testing on each production lot unit (tow cable/component parts/assembly) in accordance with Drawing 5361667, NSWCCD-SSES Specifications 0064-0010, paragraph
5 and 0064-0020, paragraphs 3.6.2, 3.6.3.1, 3.6.3.2, 3.6.4.1 thru 3.6.4.5 and 3.6.4.7. The supplier shall record the actual measurements and results of each examination, inspection and test in Specification 0064-0020, and each dimension identified on the
applicable drawing. ;
4.42 ;The supplier shall inspect each ;Tow Cable; p/n 5361667-3 upon receipt for compliance with the Preparation for Delivery requirements specified in Spec 0064-0010, paragraph 5.;
4.43 ;The supplier shall visually and physically inspect 100% each component parts p/n 5361667-5, 7 and 9 each dimension identified on Drawing 5361667, and shall verify p/n 5361667-5 and 7 all internal surfaces have been sand blast per Note 10 of the
drawing.;
4.44 ;The supplier shall inspect 100% the armor wires for a minimum of 63 micro finish specified in Spec 0064-0020, paragraphs 3.6.3.2 and 4.1.1.2a. prior to embedding into the epoxy and terminating the tow cable to the tow staff and grip.;
4.45 ;The supplier shall perform 100% hardness testing on the cured epoxy specified in Spec 0064-0020, paragraph 3.6.3.2, and shall meet the hardness requirements specified in Spec 0064-0020, paragraph 4.1.1.2b;
4.46 ;The supplier shall visually and physically inspect 100% each completed ;Tow Cable Assembly; p/n 5361667-1 each dimension and keyway location/position identified on Drawing 5361667 including the identification and markings required by Note 26 (1 thru 4)
of the drawing.;
4.47 ;The supplier shall visually inspect 100% the molded connectors p/n 5361667-21 and 22, tow staff p/n 5361667-5, grip p/n 5361667-7 and tubing p/n 5361667-263 on each completed ;Tow Cable Assembly; specified in Spec 0064-0020, paragraph 3.4.6 and
3.6.4.7 in accordance with MIL-DTL-24231, paragraph 3.4.3.;
4.48 ;The supplier shall ensure the hardness value of the cured polyurethane molding on each completed ;Tow Cable Assembly; have meet the requirements of Spec 0064-0020, paragraphs 3.6.4.7 and 4.1.1.2.;
4.49 ;The supplier shall perform 100% nondestructive bonding test on molded connectors p/n 5361667-21 and 22 on each completed ;Tow Cable Assembly; specified in Spec 0064-0020, paragraphs 3.4.6, 3.6.4.7 and 4.1.2.7 in accordance with MIL-DTL-24231, paragraph
4.5.6.1.;
4.50 ;The supplier shall perform 100% hydrostatic pressure test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.3.1 and 4.1.1.1.;
4.51 ;The supplier shall perform 100% insulation resistance test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.1 and 4.1.2.1.;
4.52 ;The supplier shall perform 100% dielectric withstanding voltage test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.2 and 4.1.2.2.;
4.53 ;The supplier shall perform 100% D. C. resistance test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.3 and 4.1.2.3.;
4.54 ;The supplier shall perform 100% capacitance test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.4 and 4.1.2.4.;
4.55 ;The supplier shall perform 100% RF loss test on each completed ;Tow Cable Assembly; in accordance with Spec 0064-0020, paragraphs 3.6.4.5 and 4.1.2.5 and their approved RF procedure.;
4.56 ;Procedure.;
4.57 ;Assembly Procedure (Tow Cable) - The supplier shall submit a written Assembly Procedure (Step by Step) for assembling the tow cable in accordance with requirements of NSWCCD-SSES Specification 0064-0020, paragraphs 3.5, 3.5.1 and 3.5.2, as indicated on
the Contract Data Requirements List (DD Form 1423). The supplier format is acceptable. Government approval of the procedure is required prior to commencement of first article.
CDRL: ASSEMBLY PROCEDURE (STEP BY STEP) per NSWCCD-SSES SPECIFICATION 0064-0020 ;
4.58 ;RF Loss Procedure - The supplier shall submit a written RF Loss Procedure for measuring RF loss on each tow cable assembly in accordance with NSWCCD-SSES Specification 0064-0020, paragraphs 3.6.4.5 and 4.1.2.5, as indicated on the Contract Data
Requirements List (DD Form 1423). The supplier format is acceptable. Government approval of the procedure is required prior to commencement of first article.
CDRL: RF LOSS PROCEDURE per NSWCCD-SSES SPECIFICATION 0064-0020 ;
4.59 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as
indicated on the Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ;
4.60 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or
NSWCPD will be performing the required Inspections/Tests. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.;
4.61 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of ;AN/BRR-6 Tow Cable Assembly;. Records shall be traceable by drawing/item, raw tow cable bulk master reel,
finished cable reel, heat, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase
order instead of originals.;
4.61.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, raw tow cable bulk master reel,
finished cable reel, heat, lot or batch, contract and assembly serial number. Supplier format is acceptable for the below listed CDRLs
a. Certified Quantitative Mill or Industrial Laboratory certifications (chemical and physical analysis) for parts 5361667-5, 7 and 9.
b. Certificate of Conformance for:(1) Materials (certifying drawing 5361667 Item Nos. 14, 17, 18, 23, 24 & 263 to the drawing, applicable specification and manufacture part number.
(2) O-Ring (certifying drawing 5361667 Item Nos. 2, 4 & 15 to the drawing, specification SAE-AS3578 (Item Nos. 2 & 4) and Item 15 manufacture part 5-320- N674-70 requirements).
(3) Epoxy drawing 5361667, Item No. 11 (certifying the epoxy has not exceeded the shelf life recommended by the manufacturer of the epoxy) and to Spec 0064-0020 requirements.
(4) Polyurethane Molding Compound Material Color Amber or Clear drawing 5361667, Item No. 12 (certifying material, type and color has notexceeded the shelf life recommended by the manufacturer as required by MIL-M-24041 and drawing requirements).
(5) Electric Plug Connector (certifying drawing 5361667 Item Nos. 21 & 22 to the drawing and applicable manufacture part number requirements).
(6) Metal Primer PR-420 and Primer PR-1523M drawing 5361667, Item Nos. 264& 265 (certifying material and type has not exceeded the shelf life recommended by the manufacturer and to drawing requirements).
(7) Passivation Treatment (certifying drawing 5361667 Item Nos.5, 7 & 9 have been passivated in accordance with Note 12 of the drawing and applicable specification requirements).
CDRL: CERTIFIED MILL CERTIFICATION per DI-MISC-80678
c. Visual/Dimensional Inspection reports shall show all the characteristics, the actual measurement results of each dimension inspected (p/n 5361667-5, 7 & 9) including sand blast of internal surfaces, contract number, name of supplier, drawing/item number,
drawing revision letter, heat or lot, serial number of finished part, item nomenclature, inspector's acceptance signature and date.
CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B
d. The supplier shall submit Production Lot (Raw Tow Cable p/n 5361667-3) Examination, Inspection and Test Reports in accordance with the requirements listed in Spec 0064-0010 paragraphs 3.5, 3.5.1, 3.5.1.2 thru 3.5.3, 3.5.3.2, 3.5.3.4, 3.5.3.5, 3.5.4 thru
3.5.4.5, 4.3 thru 4.9, 4.11, 4.12. 4.14 thru 4.22 and 5. The reports shall show all the characteristics, the actual measurement and results of each examination, inspection and test including contract number, name of supplier, drawing/item, drawing revision
letter, specification number/date, raw tow cable bulk master reel, finished cable reel, test start and stop times, gauge serial number, gauge calibrated date/due date, item nomenclature and inspector's acceptance signature and date.
CDRL: PRODUCTION LOT (TOW CABLE) REPORT per DI-NDTI-80809B
e. The supplier shall submit Production Lot (AN/BRR-6 Tow Cable Assembly p/n 5361667-1) Examination, Inspection and Testing Reports in accordance with Spec 0064-0020, paragraphs 3.6.2, 3.6.3.1, 3.6.3.2, 3.6.4.1 thru 3.6.4.5 and 3.6.4.7, and Drawing 5361667.
The reports shall show all the characteristics, the actual measurement and results of each examination, inspection, test and dimension including contract number, name of supplier, drawing/item, drawing revision letter, specification number/date, raw tow cable
bulk master reel, finished cable reel, cable assembly serial, test start and stop times, gauge serial number, gauge calibrated date/due date, item nomenclature and inspector's acceptance signature and date.
CDRL: PRODUCTON LOT (CABLE ASSEMBLY) REPORT per DI-NDTI-80809B;
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)
(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.
A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410P, 101 Strauss Avenue
Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for
certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVICP-MECH
Code 87321
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:
Commanding Officer
NAVICP-MECH
Code 009
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
6.2 ;Item 21 and Item 22 on drawing 5361667 are manufactured by TE Connectivity who bought out Rochester. These parts are not obsolete and any potential vendor can get them from TE Connectivity with the following information:
Item 21 - NIIN 01-221-1717, Manufacturer P/N MSS-L12-CCP
Item 22 - NIIN 01-221-0694, Manufacturer P/N MSS-K12-CCP;
6.3 ;For AN/BRR-6 Tow Cable Shipping/Storage Box Vendor Operating Procedures refer to drawing 8628341.;
P/N: 5361667-1
DATE OF FIRST SUBMISSION=ASREQ
;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;FIRST SPECIMEN:TOW STAFF AND MOLDED CONNECTOR ASSY PROCEDURE SHALL BE IAW DRAWING 5361667 AND SPECIFICATION 0064-0020.;;
;;SECOND SPECIMEN: TOW CABLE ASSEMBLY P/N 5361667-1 PROCEDURE SHALL BE IAW DRAWING 5361667 AND SPECIFICATION 0064-0020.;;
;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;ASSEMBLY STEP BY STEP PROCEDURE SHALL BE IN ACCORDANCE WITH SPECIFICATION 0064-0020.;;
;;RF LOSS PROCEDURE SHALL BE IN ACCORDANCE WITH SPECIFICATION 0064-0020.;;
;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;FIRST SPECIMEN: TOW STAFF AND MOLDED CONNECTOR ASSEMBLY.; ;
;;SUPPLIER FORMAT IS ACCEPTABLE.;;
;;REPORTS AS REQUIRED BY SECTION E;;
;;APPROVAL OF THE CERIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE (SECONDSPECIMEN - TOW CABLE ASSEMBLY P/N 5361667-1).;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;SECOND SPECIMEN: TOW CABLE ASSEMBLY P/N 5361667-1.;;
;;SUPPLIER FORMAT IS ACCEPTABLE.;;
;;REPORTS AS REQUIRED BY SECTION E;;
;;APPROVAL OF THE CERIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;SUPPLIER FORMAT IS ACCEPTABLE.;;
;;MATERIAL CERTIFICATION FOR DRAWING 5361667 ITEM NOS. 5, 7 & 9. CERTIFICATION OF CONFORMANCE: VARIOUS ITEMS/SEE CONTRACT SECTION E FOR DRAWING 5361667 ITEM NOS. 2, 4, 11, 12, 14, 15, 17, 18, 21 THRU24, 263, 264 & 265; FOR PASSIVATION TREATMENT (FOR ITEM NOS. 5,
7 & 9.;;
;;APPROVAL OF THE CERIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A006. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;REPORT FOR DRAWING 5361667 ITEM NUMBERS 5, 7 AND 9.;;
;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A007. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;REPORT SHALL BE IN ACCORDANCE WITH DRAWING 5361667 AND SPEC 0064-0010.;;
;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A008. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;REPORT SHALL BE IN ACCORDANCE WITH DRAWING 5361667 AND SPEC 0064-0020.;;
;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A009. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
DATE OF FIRST SUBMISSION=ASREQ
;;SUPPLIER FORMAT IS ACCEPTABLE.;;
;;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS. ;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A00A. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;