Big Bend Left Abutment Collector Pipe System
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Aug 19, 2022 05:36 pm CDT
- Original Date Offers Due: Sep 19, 2022 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Oct 04, 2022
- Initiative:
- None
Classification
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
- Place of Performance: Fort Thompson , SD 57339USA
Description
Big Bend Left Abutment Collector Pipe System, Fort Thompson, South Dakota.
The U.S. Army Corps of Engineers (USACE), Omaha District NWO, intends to pursue an award for the replacement of the Left Abutment Collector Pipe System located at the Big Bend Dam in Fort Thompson, South Dakota. The work covered in this section is outlined as a statement of construction requirements common to all the work. Specific requirements for materials and installations are provided under the Technical Sections herewith. No claims for extras shall be made on account of items presumed to have been omitted from this section. The work includes but not limited to the removal and replacement of the existing left abutment collector pipe system located on the the downstream left abutment of Big Bend Dam. The left abutment collector pipe system consists of the existing toe drain pipe, toe drain outfall, relief well collector, and relief well casing outfalls. Work to include extending the relief well collector into the relief well channel and backfilled. Six (6) existing wells are to be abandoned (RW-66, RW-66A, RW-67, RW-68, RW-68A, RW-68B) and piezometer (OW20-02) as part of this contract. Abandonment or removal of existing relief well casing outfalls as indicated on the contract drawings. The new left abutment collector pipe system will connect existing wells (RW-66B and RW-67A) and six (6) replacement relief wells (RW-66R, RW-66AR, RW-67R, RW-68R, RW-68AR, RW-68BR). The six (6) replacement relief wells will be installed by USACE prior to Contractor mobilizing to the site. Installation of four new manholes and two risers are a part of this contract. Extension of 24" CMP Culvert A and 24" RCP storm drain. A rip rapped apron will be constructed at the new relief collector pipe outfall location of the left abutment collector pipe system.
Proposals are due on or before 19 September 2022 by 1200 PM CT.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
- OMAHA , NE 68102-4901
- USA
Primary Point of Contact
- Lynne D. Reed
- lynne.d.reed@usace.army.mil
- Phone Number 4029952039
Secondary Point of Contact
- John Hickman
- john.d.hickman@usace.army.mil
- Phone Number 4029952613
History
- Oct 04, 2022 10:56 pm CDTSolicitation (Updated)
- Aug 23, 2022 11:24 am CDTSolicitation (Updated)
- Aug 23, 2022 09:32 am CDTSolicitation (Updated)
- Aug 23, 2022 09:30 am CDTSolicitation (Updated)
- Aug 23, 2022 08:52 am CDTSolicitation (Updated)
- Aug 19, 2022 05:36 pm CDTSolicitation (Original)