USACE SPK DB Construction - Building 1286 Steam Plant Upgrades at Hill AFB, UT

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 19, 2022 09:58 am PDT
  • Original Published Date: Mar 02, 2022 06:42 pm PST
  • Updated Date Offers Due: Jul 25, 2022 09:00 am PDT
  • Original Date Offers Due: Apr 05, 2022 01:00 pm PDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 09, 2022
  • Original Inactive Date: Apr 20, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z2NB - REPAIR OR ALTERATION OF HEATING AND COOLING PLANTS
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Hill AFB , UT 84056
    USA

Description

The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) has a new requirement to complete two-phase design-build construction services to upgrade the Steam Plant at B1286 on Hill AFB, UT.

This project will include the replacement of three (3) existing boilers in B1286 with new dualfuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain “N+1” boiler redundancy in the plants. 

The boilers in B1286 will be replaced with two (2) new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. The Contractor shall develop and complete the designs and construct the facility. The Contractor will be given a "buildable area" boundary, to best locate/layout the proposed facility.

The solicitation, plans, and specifications are available for inspection without charge when accessed through the GPE or when requested and delivered by electronic mail and/or data interchange. 

In accordance with DFARS 236.204(i), the magnitude of construction for this requirement is estimated to be between $10,000,000 and $25,000,000

The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this solicitation or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and the solicitation. 

PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.

____________________________________________________________________________

SAM Posting Amendment 0001 - Changes NAICS code from 238220 to 236220; Update sections 00 21 00 and  00 22 00.  

________________________________________________________________________________________________________

SAM Posting Amendment 0002 - Establish Phase II proposal date and time submission;  Update sections 00 21 00 and  00 22 00; issue updated attachments for Phase II; reopen Projnet; require bid guarantee for phase II proposals; add site visit information; revise line item structure.  

________________________________________________________________________________________________________Sam Posting - Upload the site visit sign-in sheet and site visit agenda. 

________________________________________________________________________________________________________

SAM Posting Amendment 0003 - Extend the solicitation proposal due date from 1:00 PM PST,  27 June 2022 to 1:00 PM PST 15 July 2022.

________________________________________________________________________________________________________

SAM Posting Amendment 0004 - Add feasibility study Attachment 13, and extend the solicitation proposal due date from 1:00 PM PST, 15 July 2022 to 9:00  PM PST 25 July 2022.

________________________________________________________________________________________________________

SAM Posting Amendment 0005 - Update sections, 00 21 00; 00 22 00; 00 73 00 and incorporate Government Furnished Property (GFP) provisions and clauses.  