Skip to main content

An official website of the United States government

You have 2 new alerts

F--MCCULLOUGH PEAKS SALT CEDAR REMOVAL 2024

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 10, 2024 10:55 am MDT
  • Original Published Date: Jul 03, 2024 08:41 am MDT
  • Updated Date Offers Due: Jul 26, 2024 02:00 pm MDT
  • Original Date Offers Due: Jul 19, 2024 02:00 pm MDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 10, 2024
  • Original Inactive Date: Aug 30, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: F014 - NATURAL RESOURCES/CONSERVATION- TREE THINNING
  • NAICS Code:
    • 115310 - Support Activities for Forestry
  • Place of Performance:
    1002 BLACKBURN AVE Cody , WY
    USA

Description

MCCULLOUGH PEAKS SALT CEDAR REMOVAL 2024

Wyoming State Commercial Applicator's License is required for the chemicals used to treat the salt ceder stumps.

Proof of license must be provided with proposal.


Site visit:


Meetup Location
BLM-WY CODY FIELD OFFICE
1002 BLACKBURN AVE
CODY WY 82414

Time: Wednesday, July 18th 2024 at 8AM

RSVP Abel Guevara, aguevara@blm.gov

Site Coordinates:

The center of the project is -108.5137883 44.4727864.


CONTRACTOR FURNISHED ITEMS

The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and incidental services necessary.

Quality Control Plan

The Contractor shall establish and maintain a Quality Control Program to ensure the requirements of the contract are achieved. One copy of the Contractor's Quality Control Plan shall be provided to the Contracting Officer prior to the start of contract work.

TASKS/CRITICAL SUBSTASKS AND STANDARDS

Task 1: Lop and scatter 100% of Salt Cedar within the designated 8 acre unit.

Standard/AQL: Cut and scatter 100% of Salt Cedar within 8 acres of the FOAL Solar Well Project Area. Salt Cedar would be cut to 3-5 inches above ground level. Cut juniper skeletons may be left where they are cut. No cut material will be scattered/ piled in roadways. Work quality inspection will focus on the removal of Salt Cedar cut to 3-5 inches above ground. Pictures of project area are attached to show the project area.

Unless presenting a safety hazard to workers No aspen, or any native live trees will be cut.

Task 2: Spray salt cedar stumps with Element within the designated 8-acre unit.

Standard/AQL: After salt cedars have been cut, the salt cedar stumps will be sprayed with Element 4 and Basal Bark Oil within the designated 8 acre unit. Work quality inspection will focus on the herbicide spraying of all Salt Cedar stumps.

Task 3: Communication will be in English both written and verbal.

Standard/AQL: While production work is being completed verbal communications will be completed at a minimum every third day to the Contracting Officer Representative (COR) or Project Inspector (PI)
SPECIFICATIONS

All unit boundaries are marked with either flagging or tree marking paint.

Work to be completed using hand equipment (chainsaw). Support from small equipment such as a 4- wheeler or side by side UTV to facilitate equipment (chainsaw) or fuel movement as well as medical incidents is also allowed but travel is restricted to existing roads and trails. No heavy equipment use will be permitted.

Work shall be started no earlier than October 1, 2024, and shall be completed no later than November 15, 2024, to complete Task 1 and 2 of the cutting of salt cedar and spraying salt cedar stumps with herbicide within the project area.

Work to be completed using hand equipment (chainsaw). No heavy equipment use will be permitted.

All Machinery/saws shall be equipped with approved spark arrestors.

Work shall be stopped if road conditions become poor due to excessive moisture (mud/rain/snow). The government will monitor road conditions and keep the contractor informed.

L.1 TECHNICAL PROPOSAL CONTENTS

QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL: Offerors shall submit a one-page resume of all key personnel proposed for this contract.

PAST PERFORMANCE: Offerors shall submit a list of clients for past and present similar projects covering the past three (3) years. Provide: contact name, address, phone number, fax number, e-mail address. The Government will survey these clients to obtain past performance information (quality, timeliness, cost control, business relationships) related to Offeror's current and past work.

TIMELINESS: Offerors shall submit their work schedule for this project.

Contact Information

Contracting Office Address

  • 5353 YELLOWSTONE RD
  • CHEYENNE , WY 82009
  • USA

Primary Point of Contact

  • Nelson, Antoinette
  •   amnelson@blm.gov
  •   Phone Number 307-775-6043
  •   Fax Number 307-775-6317

Secondary Point of Contact





History