ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||
TIME OF DELIVERY (JUNE 1997)|20|||||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORTS (COMBO)||N/A|N00383|N/A|N/A|N/A|N/A|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
VALUE ENGINEERING (JUN 2020)|3||||
EQUAL OPPORTUNITY (SEP 2016)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT|||||
SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||
LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||
LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|336413|1250||||||||||||
FACSIMILE PROPOSALS (OCT 1997)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|
The purpose of this amendment is to clarify the following:
1. PLT, FAT, & CDRL are hereby waived for this requirement.
All other terms and conditions remain unchanged.
The purpose of this amendment is to clarify the following contractual changes:
1. Bag and Tag IUID is applicable for NIIN 01-461-7380.
All other terms and conditions remain unchanged.
1. SCOPE
1.1 . Forging(s) part number ;74A481699Rev "C"; shall be procured from the following company(ies): ;APPROVED FORGING HOUSE;
; ;
1.2 . Markings shall be in accordance with MIL-STD-130.
1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BOEING; drawing number ( ;76301; ) ;74A481700-2011; , Revision ;N; and all details and specifications referenced therein.
1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.5 If MIL-STD 454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with the latest revision of MIL-STD 2000 paragraph 1.2.6 (Soldering Specification). Contractors will not be denied consideration for
contract award solely because they have not been able to obtain certifications due to unavailability of class billets in authorized soldering training schools. Contractors making a good faith effort to obtain class billets to certify the necessary personnel
shall be given equal opportunity to do so and to compete for contracts.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS - NOT APPLICABLE
4. QUALITY ASSURANCE
ALL THE QUALITY ASSURANCE REQUIREMENTS AND DD1423'S ARE 'HARD COPY" AND ARE RETAINED BY THE FOLLOWING PERSONNEL:
Robert Harris N22, robert.j.harris2@navy.mil
Chris Hess NAVAIR 4.3.4.1, william.c.hess1@navy.mil
Robert Hughes N23.1 / robert.w.hughes@navy.mil / ext 5994
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
all DD1423 data is hard copy and will be provided upon request. Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources/ or NADCAP Approved,
certified
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ;FIRST PRODUCTION LOT INSPECTION/TEST(FAT)
PRODUCTION LOT INSPECTION/TEST; testing sample.
^ Block 14: Make submission to ;DCMA-QAR
PCO
NAVSUP CODE N23
NAVAIR CODE 4.3.4.1; .
Block 13: Second submission required if the process/operation changes after approval of ; FIRST PRODUCTION LOT INSPECTION/TEST(FAT)
PRODUCTION LOT INSPECTION/TEST ; test.
^^ Block 14: Make submission to ;DCMA-QAR
NAVSUP WSS CODE N23
PCO
NAVAIR 4.3.4.1; .
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ; FIRST PRODUCTION LOT INSPECTION/TEST(FAT)
PRODUCTION LOT INSPECTION/TEST ; testing sample.
^ Block 14: Make submission to ;DCMA-QAR
NAVSUP CODE N23
PCO
NAVAIR 4.3.4.1; .
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
HARDSURFACE AND HEAT TREAT PER PS15989 USING -METCO-THERMOSPRAY 12C XPT-595
POWDER EXCEPT THAT FINISH COATING THICKNESS SHALL BE .030 +/- .010.
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
74A481699 POINT, DIE FORGING-ARRESTING HOOK
1. RAW MATERIAL IAW (76301) 74A481699-2003
2. DIE FORGING / 4330V MODIFIED / AMS6411
3. INSPECTION AND ACCEPTANCE OF THE FORGING IAW: PS23006 GRADE A
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
NSPECTION AND ACCEPTANCE OF THE FORGING IAW: PS23006 GRADE A
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER