Skip to main content

An official website of the United States government

You have 2 new alerts

Portable Open-Path TDL Analyzers

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: May 19, 2023 11:04 am CDT
  • Original Date Offers Due: Jun 05, 2023 04:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Jun 20, 2023
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: 6640 - LABORATORY EQUIPMENT AND SUPPLIES
  • NAICS Code:
    • 334516 - Analytical Laboratory Instrument Manufacturing
  • Place of Performance:
    Florence , SC 29501
    USA

Description

Minimum Requirements

1) The OP TDL instrument must be able to measure either NH3 or CH4.

2) OP CH4. TDL must be able to measure CH4.concentration at a minimum of 2 ppm-m; Sensitivity: 0.5 ppm-m; Full Scale: 8,500 ppm-m.

3) OP NH3. TDL must be able to measure NH3 concentration at a minimum of 8 ppm-m; Sensitivity: 2 ppm-m; Full Scale: 6,500 ppm-m.

4) OP TDL path length (separation path) of operation should be between 5 to 500 m.

5) OP TDL must be able to store data for months at a time.

6) OP TDL must be able to have remote diagnostics and data transmission via wireless communications

7) OP TDL must be able to compensate for pressure and temperature from internal pressure and temperature sensors.

8) OP TDL must include Onboard Firmware (no computer required for operation)

9) OP TDL must have little to no temperature drift from -40 to 50C.

10) OP TDL must have a touchscreen interface with numerical/graphical data displays, including spectral waveforms.

Contact Information

Contracting Office Address

  • 141 EXPERIMENT STATION ROAD
  • STONEVILLE , MS 38776
  • USA

Primary Point of Contact

Secondary Point of Contact





History