CA FTNP MOJA 12(1) CIMA ROAD

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Oct 06, 2022 02:47 pm MDT
  • Original Published Date: Oct 04, 2022 01:32 pm MDT
  • Updated Date Offers Due: Nov 10, 2022 02:00 pm MST
  • Original Date Offers Due: Nov 10, 2022 02:00 pm MST
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 10, 2022
  • Original Inactive Date: Dec 10, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Baker , CA
    USA

Description

CA FTNP MOJA 12(1) CIMA ROAD

The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 17.1 miles of Cima Road in San Bernardino County, California.  The project also includes installation of low water crossings/shoulder stabilization areas along Cima Road with spot locations on Kelbaker Road, Lanfair Road, and Cedar Canyon Road.  The project is located in a remote area approximately 75 miles from Las Vegas, NV, the closest major metropolitan area.

The Cima Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment in select areas, reinforcing low water crossings, and improving safety with longitudinal and transverse rumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with rip rap revetment.

The Kelbaker Road improvements consist of a rip rap shoulder stabilization area and four shoulder asphalt patching locations.  Lanfair and Cedar Canyon Roads consist of two low water crossings and a roadway slope stabilization area.

 Construction duration is estimated at 12-18 months.

The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. 