Skip to main content

An official website of the United States government

You have 2 new alerts

Fiber Installation for C-64D

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: May 03, 2022 11:16 am CDT
  • Original Published Date: Apr 19, 2022 02:44 pm CDT
  • Updated Date Offers Due: May 13, 2022 03:00 pm CDT
  • Original Date Offers Due: May 09, 2022 03:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jun 09, 2022
  • Original Inactive Date: Jun 09, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: 5995 - CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT
  • NAICS Code:
    • 334290 - Other Communications Equipment Manufacturing
  • Place of Performance:
    Eglin AFB , FL 32542
    USA

Description

Fiber Installation for C-64D see attached documents

REQUEST FOR PROPOSAL
NETWORK OPERATIONS & INFRASTRUCTURE SOLUTION
(Site C-64) LRSF Fiber Optic Cable installation
The contractor shall provide all equipment, parts, tools, and labor to engineer, furnish, install and test. The Project is for the installation of a 144SM FOC to a distribution hand-hole by new LRSF facility being built on range C-64. A 24 strand fiber will be spliced and installed / terminated in the LRSF from the distribution hand-hole. The 144SM FOC will be installed in an existing 2-Way 4” Manhole Duct system from B9620 to new facility being built 1.37 miles east of B9620. This project is required for communication capabilities to AFRL personnel. The Contractor shall engineer, furnish, install and test (EFI&T) the following requirement. All equipment, supplies, and materials provided shall be new and not refurbished. Period of performance shall be 180 calendar days.
This RFP is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the contractor for this requirement. The Government reserves the right not to award a task order in response to this RFP. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.
This procurement will be a 100% Small business Set Aside. RECOMMENDED SITE VISIT INFORMATION
Email stephanie.aiken@us.af.mil to RSVP for the site visit by 22 April 2022 NLT 11:59 PM Central Time. If personnel have a CAC or access to base, then send the name and personal contact information (Cell Phone) only in the RSVP and specify they already have access. If your personnel need a base pass, please send their name, birth date, and personal contact information (Cell Phone). Upon receipt of list of names, birth dates, and contact information (cell phone), the Contract Specialist will submit the information to Security Forces, which takes approximately 3-5 days for approval.
The site visit is scheduled for 4 May 2022 at 9:00 AM Central Time. The site visit will begin at building B9620 Site C-64ABC Range Rd 213. Personnel needing a pass should report to the West Gate (Shalimar near Hospital) Visitor Center with picture ID. If you need directions once on base, please contact the Contract Specialist.
DEADLINE INFORMATION
Questions regarding this RFP are due no later than 4 May 2022 NLT and shall be submitted to the Contract Specialist, Stephanie Aiken, at stephanie.aiken@us.af.mil
Delivery Terms are FOB Destination with delivery to Eglin AFB, FL.
Period of Performance is as follows: 180 Days ADC
The following attachments/documents are provided for preparation of a proposal and access to the site visit:
1. Removed
2. Addendum to 52.212-1&3 5.2.22
3. Addendum to 52.212-2
4. Performance Work Statement 3.3.22
5. 90% Design Drawings
6. 96 CS Design Guide
7. Dec 2021 Reps and Certs
8. Wage Determination 2015-4532 REV 19 

9. Request for Base Pass Memo
10. Offeror Schedule

11. Questions and Answers 5.02.22

Contact Information

Contracting Office Address

  • ADMIN ONLY NO REQTN CP 850 882 5040 308 WEST D AVE BLDG 260 STE 130
  • EGLIN AFB , FL 32542-5418
  • USA

Primary Point of Contact

Secondary Point of Contact





History