Fort Buchanan Puerto Rico Industry Day
General Information
- Contract Opportunity Type: Special Notice (Updated)
- Updated Published Date: Nov 21, 2023 08:40 am EST
- Original Published Date:
- Requirements Strategy:
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Dec 15, 2023
- Original Inactive Date:
- Initiative:
Classification
- Original Set Aside:
- Product Service Code:
- NAICS Code:
- Place of Performance: San Juan , PRUSA
Description
Pre-Proposal Conference (Industry Day)
Time: 0830 EST Registration
0900 -1500 EST Event
Agenda: Morning session will be focused on Military Construction / Vertical Construction projects
Fort Buchanan Army Reserve Center
Fort Buchanan Advanced Skills Training Barracks
Afternoon Session will be focused on Military Construction / Energy Resiliency projcts
Ramey ARC Microgrid Control System
LTC H G Pesquera Microgrid Control System
Fort Buchanan Microgrid & Backup Power
Fort Buchanan Potable Water Purification System
The Pre-Proposal Conference informational presentation will be conducted on Thursday, 02 November 2023 at the following location:
PROFESSIONAL COLLEGE OF ENGINEERS AND LAND SURVEYORS OF PUERTO RICO
Urb. Roosevelt, 500 C/Antolin Nin, Hato Rey, PR 00918-PO Box 363845, San Juan PR 00936-3845
Webex (Virtual Participation):
https://usace1.webex.com/meet/john.f.miozza
Phone : 844.800.2712
Access: 199 566 2356
DESCRIPTION: The proposed project is a design/bid/build project is for the construction of a 1400-member Army Reserve Center (ARC) Training Building in the vicinity of Fort Buchanan. Primary facilities include the construction of an ARC Training Building comprised of classrooms, assembly hall, arms vault, restrooms and unit storage areas for 27 Army Reserve units. Building(s) will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Facilities will be built to seismic and life safety code requirements. Supporting facilities include land clearing, paving, sidewalks, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 161 Tons)