P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Apr 22, 2024 05:13 pm PDT
  • Original Date Offers Due: May 22, 2024 02:00 pm PDT
  • Inactive Policy: Manual
  • Original Inactive Date: Dec 30, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
  • NAICS Code:
    • 237130 - Power and Communication Line and Related Structures Construction
  • Place of Performance:
    Twentynine Palms , CA 92277
    USA

Description

This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build
contract for the design and construction of 10 MW (6.5 MW Base Item and 4MW in option items) of Battery Energy
Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the
associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)
arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's
electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the
installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV
variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and
islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy
management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber
secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The
project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV
systems.
 