P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 22, 2024 05:13 pm PDT
- Original Date Offers Due: May 22, 2024 02:00 pm PDT
- Inactive Policy: Manual
- Original Inactive Date: Dec 30, 2025
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
- NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
- Place of Performance: Twentynine Palms , CA 92277USA
Description
This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build
contract for the design and construction of 10 MW (6.5 MW Base Item and 4MW in option items) of Battery Energy
Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the
associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV)
arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's
electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the
installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV
variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and
islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy
management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber
secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The
project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV
systems.
Attachments/Links
Contact Information
Contracting Office Address
- 750 PACIFIC HIGHWAY
- SAN DIEGO , CA 92132-0001
- USA
Primary Point of Contact
- Sheena F. Hess
- sheena.f.hess.civ@us.navy.mil
- Phone Number 6197054643
Secondary Point of Contact
- Victor Mariscal
- victor.m.mariscal.civ@us.navy.mil
- Phone Number 6197054657
History
- Apr 17, 2025 07:55 am PDTSolicitation (Updated)
- Apr 02, 2025 06:54 am PDTSolicitation (Updated)
- Apr 01, 2025 01:44 pm PDTSolicitation (Updated)
- Mar 27, 2025 02:55 pm PDTSolicitation (Updated)
- Jan 29, 2025 06:42 am PSTSolicitation (Updated)
- Jan 17, 2025 06:31 am PSTSolicitation (Updated)
- Dec 30, 2024 08:55 pm PSTPresolicitation (Updated)
- Sep 20, 2024 03:07 pm PDTSolicitation (Updated)
- May 17, 2024 07:12 am PDTSolicitation (Updated)
- May 02, 2024 02:59 pm PDTSolicitation (Updated)
- Apr 22, 2024 05:13 pm PDTSolicitation (Original)