Littcarr Sediment Dam Raise and Armor
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Apr 25, 2023 03:20 pm EDT
- Original Published Date: Apr 25, 2023 01:23 pm EDT
- Updated Date Offers Due: May 24, 2023 01:00 pm EDT
- Original Date Offers Due: May 24, 2023 01:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jun 08, 2023
- Original Inactive Date: Jun 08, 2023
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Z1KA - MAINTENANCE OF DAMS
- NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
- Place of Performance: Littcarr , KY 41834USA
Description
This Invitation for Bid (IFB) will be for one (1) Firm-Fixed-Price Contract for the Littcarr Sediment Dam Raise and Armor in Littcarr, KY.
The existing gravel access road will be re-established by placing new KYTC No.57 stone along the existing gravel roadway. This gravel access road will then be used as the project construction entrance. Within the area of the depression over the conduit, several of the large boulders will be moved upstream to their pre-flood location (approximately 10-20 feet) to re-establish the downstream slope protection.
New KYTC Class III Channel Lining will be placed along the crest and downstream slope of the dam to provide armoring against erosion and to raise the overall height of the dam approximately 30”. Additionally, a 12-feet wide access road shall be established along the entire length of the dam crest on top of the new rip rap. This dam crest access road will be constructed to a minimum
thickness of 6-inches using KYTC No.4 stone. Upon completion of the repairs all access roads will remain in place and be utilized for future project use.
This project includes Options to place new rip rap over the crest and downstream slope of the dam.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING DIVISION 600 DR MARTIN LUTHER KING JR PL
- LOUISVILLE , KY 40202-2230
- USA
Primary Point of Contact
- John Butts
- john.c.butts@usace.army.mil
- Phone Number 5023156591
Secondary Point of Contact
- SFC Brandon Barber
- brandon.barber@usace.army.mil
- Phone Number 5023156566
History
- Jun 09, 2023 11:59 pm EDTSolicitation (Updated)
- May 10, 2023 11:58 pm EDTPresolicitation (Original)
- Apr 25, 2023 03:20 pm EDTSolicitation (Updated)
- Apr 25, 2023 01:23 pm EDTSolicitation (Original)