Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RPR) Phase V, Capital Power Plant

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Mar 08, 2022 08:51 am EST
  • Original Published Date: Feb 25, 2022 12:05 pm EST
  • Updated Date Offers Due: Mar 25, 2022 04:00 pm EDT
  • Original Date Offers Due: Mar 25, 2022 04:00 pm EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Apr 09, 2022
  • Original Inactive Date: Apr 09, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Washington , DC 20515
    USA

Description

This is the Soliciation for the Architect of the Capitol has a requirement for Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RFP) Phase V, Capital Power Plant (CPP) (Project Number PP
08001J) – Construction Services involves the revitalization of the West Refrigeration Plant (WRP) and limited work in
the West Refrigeration Plant Expansion (WRPE). All work will occur within an existing and fully operational plant.
The project, including Base Bid and all Options is expected to be $10M and above. This phase shall include the
following:
Base Bid: Demolition and replacement of Chilled Water Piping in the WRP basement. Work will include piping 42”
diameter and below, to include insulation, jacketing, and miscellaneous devices and valves as described in
construction documents.
1. Sub-Option A: Condenser Water piping (Basement). This sub-option includes the demolition and new work
construction of the condenser water piping in the Basement Level of the WRP only.
2. Sub-Option B: Condenser Water piping (First Floor). This sub-option includes the demolition and new work
construction of the condenser water piping on the First Floor of the WRP only.
3. Sub-Option C: WRP condenser water filtration system. This sub-option includes the new work construction of the
condenser water traveling screen filtration system located in the Basement Level of the WRP only.

4. Sub-Option D: WRPE condenser water filtration system. This sub-option includes the new work and limited
demolition construction of the condenser water traveling screen filtration system located in the Basement Level of
the WRPE only.
5. Sub-Option E: WRP/WRPE ball cleaner system. This sub-option includes the new work and limited demolition
construction of the ball cleaner system located on the First Floors of the WRP and WRPE.
6. Sub-Option F: WRPE Electro Cell Particle Precipitator Filter. This sub-option includes the demolition and new
work construction of the electro cell particle precipitator filter system for the condenser water located in the
Basement Levels of the WRP and WRPE.
7. Sub-Option G: WRPE Piping Seismic Supports. This sub-option includes the new work construction costs to install
seismic supports to the existing chilled water and condenser water piping on the WRPE’s Basement Level and First
Floor.
Construction Duration – Base Bid: The construction duration for completion of the base bid shall be no more than
548 calendar days (18 months) from the Notice to Proceed (NTP). Bid Options will be awarded within one calendar
year from Base Bid NTP. Project duration for bid options varies depending on timing of award, not to exceed 912
calendar days (30 months) from Base Bid if awarded one year from Base Bid NTP.

Contact Information

Contracting Office Address

  • 2nd & D Streets, SW FHOB - Room 264
  • Washington , DC 20515
  • USA

Primary Point of Contact

Secondary Point of Contact





History