CA ERFO SIERRA NF 05S07(1) NORRIS CREEK BRIDGE
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Jan 23, 2023 03:10 pm MST
- Original Published Date: Oct 03, 2022 07:23 am MDT
- Updated Date Offers Due: Nov 08, 2022 02:00 pm MST
- Original Date Offers Due: Nov 03, 2022 02:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 23, 2022
- Original Inactive Date: Nov 18, 2022
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
- Place of Performance: Oakhurst , CA 93644USA
Description
CA ERFO SIERRA NF 05S07(1) - NORRIS CREEK BRIDGE
PROJECT DESCRIPTION AND LOCATION: The Sierra National Forest (SNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season.
The project site is located approximately 37.2 miles northeast of Oakhurst, CA on Forest Service Route 05S007 (Beasore Road) within Sierra National Forest in Madera County, CA.
The original bridge was a one lane, two-way traffic single span structure at a 15-degree skew. It had an overall bridge length of 37 feet, roadway width (curb to curb) of 14.1 ft, and deck width (outside to outside) of 15.4 ft.
SCOPE OF THE WORK: The purpose of the project is to replace the Norris Creek Bridge over Norris Creek within Sierra National Forest in Madera County, California. The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. A two-lane, 70-ft x 24-ft proposed structure is anticipated.
The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to match the existing roadway section. Bridge rail and guardrail with terminals will be included.
Items worth noting:
- The work will be listed within a single Schedule (Schedule A) and no options are proposed.
- Adjacent segments of Forest Route 05S007 will remain closed during construction and can be used for contractor staging and storage.
- Access is to both sides of the bridge is possible by an approximate 7.5-mile detour.
- Deep foundations (micro-piles or drilled shafts) are anticipated
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 1 (LPSM) of Removal of Existing Structures and Obstructions
- 8500 CUYD of Excavation/Embankment Construction
- 250 CUYD of Riprap
- 300 TON of Roadway Aggregate
- 70-ft x 256-ft of Prefabricated Steel Bridge
- 200 TON of Asphalt Pavement
- 150 LNFT of Guardrail, including terminals
- 80 hours of Equipment Hours
- 40 hours of Labor Hours
ESITMATED MAGNITUDE: Between $700,000 and $2,000,000
Attachments/Links
Contact Information
Contracting Office Address
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
Primary Point of Contact
- Kelly Palmer
- CFLConracts@dot.gov
- Phone Number 7209633500
Secondary Point of Contact
- Sheri Walsh
- cflcontracts@dot.gov
- Phone Number 720-963-3500
History
- Jan 27, 2023 09:58 pm MSTSolicitation (Updated)
- Jan 23, 2023 03:10 pm MSTSolicitation (Updated)
- Nov 23, 2022 09:56 pm MSTSolicitation (Updated)
- Nov 01, 2022 10:25 am MDTSolicitation (Updated)
- Oct 31, 2022 11:02 am MDTSolicitation (Updated)
- Oct 25, 2022 09:26 am MDTSolicitation (Updated)
- Oct 24, 2022 11:53 am MDTSolicitation (Updated)
- Oct 24, 2022 11:40 am MDTSolicitation (Updated)
- Oct 15, 2022 09:56 pm MDTPresolicitation (Original)
- Oct 03, 2022 07:23 am MDTSolicitation (Original)