Skip to main content

An official website of the United States government

You have 2 new alerts

2023 Poplar Island Spillway Rehabilitation, Talbot County, Maryland

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: May 16, 2023 01:11 pm EDT
  • Original Date Offers Due: Jun 23, 2023 11:00 am EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Sep 30, 2023
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z2KF - REPAIR OR ALTERATION OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:

Description

Poplar Island is an ecosystem restoration project located in the upper-middle Chesapeake Bay in Talbot County, Maryland, approximately 39 miles south-southeast of the Port of Baltimore and two miles northwest of Tilghman Island.The primary purpose of this contract is to repair two existing spillway structures and plug and abandon several unused spillway structures. Poplar Island utilizes spillway structures to discharge water from inside the island, under the perimeter dikes, and out to the Chesapeake Bay. Each spillway consists of two ? 36-inch corrugated metal pipes of approximately 100 ft in length, which are controlled by individual sluice gates. The Spillway Rehabilitation work consists of slip ling four ? 36-inch corrugated metal pipes with HDPE pipes, and minor structural repairs to the sluice gates and appurtenant features. Abandonment work will include filling and capping between four and eight 36-inch corrugated metal pipes to prevent long term impacts to the island?s perimeter dikes. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. All work will be performed within Cells 1, 3, 4, and 5 of Poplar Island, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The anticipated period of performance is approximately 120 calendar days.

Contact Information

Contracting Office Address

  • RESOURCE MANAGEMENT OFFICE 2 HOPKINS PLAZA
  • BALTIMORE , MD 21201-2526
  • USA

Primary Point of Contact

Secondary Point of Contact

History