Skip to main content

An official website of the United States government

You have 2 new alerts

P-239, F-35 Flightline Utility Modernization Phase II, Design-Bid-Build Marine Corps Air Station, Cherry Point, North Carolina

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Aug 25, 2023 09:14 pm EDT
  • Original Published Date: May 30, 2023 04:20 pm EDT
  • Updated Date Offers Due: Sep 12, 2023 02:00 pm EDT
  • Original Date Offers Due: Jul 17, 2023 02:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Feb 20, 2024
  • Original Inactive Date: Feb 20, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Cherry Point , NC
    USA

Description

P-239, F-35 Flightline Utility Modernization Phase II, Marine Corps Air Station, Cherry Point, North CarolinaThis work includes P239 F-35 Flightline Utility Modernization Phase II, Design Bid Build, Marine Corps Air Station MCAS, Cherry Point. P-239 will upgrade, renovate, and modernize base utilities in the core area to servefuture airfield facilities. Utility work includes fire protection lines, potable water lines, communication fiber and duct bank, sanitary sewer, electrical distribution lines, substation upgrades, industrial wastewater lines, natural gas,and steam distribution. Project is considered Phase 2 of 2. The project will separate the fire protection system for the deluge sprinkler and existing aqueous film forming foam systems flight line buildings from the existing potablewater system. The new fire distribution system will include pipeline, fire pumps, fire pump buildings and water storage facilities. The potable water distribution system along A Street will be resized to correct the hydraulics andimprove water quality to the existing buildings. This project will also include new water service connections, advanced meters and the connection to the existing system along A Street. Elevated water storage tanks will berepaired and/or replaced to support the hydraulic changes. Communications pathways consisting of fiber, duct banks, manholes, and cable will be constructed along A Street. Infrastructure will be modernized to support ALIS.Provide hardware installation/replacement, new splices, expand vault and additional coring. Sanitary sewer system will be a gravity collection system to replace the aged wastewater collection mains, pump station and lift stations.

Contact Information

Contracting Office Address

  • 9324 VIRGINIA AVENUE
  • NORFOLK , VA 23511-0395
  • USA

Primary Point of Contact

Secondary Point of Contact





History