Skip to main content

An official website of the United States government

You have 2 new alerts

Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Project Construction, Glynn County

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: May 01, 2024 10:18 am EDT
  • Original Response Date: May 15, 2024 01:00 pm EDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: May 30, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Brunswick , GA
    USA

Description

This is a PRE-SOLICITATION NOTICE for the FY24 Savannah Inner Harbor Maintenance Dredging. This acquisition will be offered as an unrestricted competitive solicitation and will result in a Firm Fixed Price Contract Award. The magnitude of this requirement per DFARS 236.204(ii) is between $10,000,000.00 and $25,,000,000.00

Project Description: The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island.

Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.

Contact Information

Primary Point of Contact

Secondary Point of Contact

History