Skip to main content

An official website of the United States government

You have 2 new alerts

B510--Remediation | Wichita VAMC

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 01, 2024 03:28 pm CDT
  • Original Published Date: May 30, 2024 07:25 am CDT
  • Updated Date Offers Due: Jul 12, 2024 05:00 pm CDT
  • Original Date Offers Due: Jun 07, 2024 05:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Aug 11, 2024
  • Original Inactive Date: Aug 06, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: B510 - SPECIAL STUDIES/ANALYSIS- ENVIRONMENTAL ASSESSMENTS
  • NAICS Code:
    • 562910 - Remediation Services
  • Place of Performance:

Description

Which tasks are actually included in the scope outlined under B.2.8 Task List ?  Tasks which do not include N/A would be within current scope. The note under the table says that N/A items will not be completed, were performed previously, or will be completed in-house.  Does this refer only to Tasks 1-11 where N/A is marked in the Task Description column or all the tasks marked N/A in the Task column? Any Tasks which include N/A would not be within current scope; these tasks will not be completed, were performed previously, or will be completed in-house. For lab analysis of all sampled soil and groundwater, are there any constituents of concern beyond PCBs? Task 16  The current contract SOW Task List does not include this work. Is the Paperwork to be prepared for deed restriction the responsibility of the contractor to draft or is it a standard form sourced from KDHE? The current contract SOW Task List does not include this work. What regulatory levels for PCBs are the comparison metrics to determine the deed restrictions, based on the soil and groundwater sampling conducted in Task 13? Task 17 The current contract SOW Task List does not include this work. Is the cap a physical barrier/engineering control or does it refer to a Corrective Action Plan (CAP)? Task 19 Task 19 does not reference cap and the current contract SOW Task List does not include this work. What are the specs of the sump system to be installed and who is responsible for the installation? The current contract SOW Task List does not include installation of a sump system. How many influent/effluent water samples per sampling event are required for satisfaction of the task? Task 21 The current contract SOW Task List does not include this work. Has a hydrogeological survey been completed that identifies the depth of the water table and viable locations for monitoring wells or is this up to the determination of the installing contractor? The current contract SOW Task List does not include installation of monitoring wells.

Contact Information

Contracting Office Address

  • VA MEDICAL CENTER 4101 SOUTH 4TH STREET
  • LEAVENWORTH , KS 66048
  • USA

Primary Point of Contact

Secondary Point of Contact





History