Cape Cod Canal, West Boat Basin – Mooring Piles & Dock Replacement
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 11, 2023 08:24 am EDT
- Original Response Date: May 26, 2023 01:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date:
- Initiative:
- None
Classification
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
- Place of Performance: Bourne , MA 02532USA
Description
The U.S. Army Corps of Engineers, New England District is issuing a set aside for certified small business contractors for the Mooring Piles and Dock Replacement project at the West Boat Basin located at the Cape Cod Canal, Bourne, Massachusetts. The NAICS code for the work described below is 237990 with a size standard of $45M. The project is planned to be issued in June 2023 and will be set aside for Small Businesses. The period of performance will be approximately 365 days. The estimated magnitude of this project is between $1,000,000 and $5,000,000.
Docks:
There are four dock structures within the West Boat Basin. One of the docks shall be demolished and replaced while the other three docks shall be repaired.
The timber portion of Dock 1, approximately 6.0 feet wide, shall be demolished in its entirety except for the existing piers, which shall remain in place and shall be reused for the construction of a new dock at
this location. The new dock structure shall include new lumber, new fiberglass reinforced grate walking surfaces, new connectors, and other new items as necessary. This dock requires the removal and replacement of the existing power pedestal, light pole, and tide gauge. In addition to providing this new dock, a new adjacent pre-engineered floating dock with connecting gangway shall be installed. On the
landside, the existing concrete sidewalk that abuts the dock shall be removed and replaced. Similarly, the electrical handhole and 75-feet of electrical conduit attached to the underside of this dock shall be replaced.
The other three docks (Docks 2, 3, and 4) require repair work to the adjacent concrete sidewalks, and replacement of the existing stairs, handrails, electrical power pedestals, and light fixtures.
Mooring Piles:
There are 16 steel pile mooring dolphins within the West Boat Basin. Five of these 16 dolphins, cluster H-Piles at approximate pile lengths of 80 feet and located adjacent to Dock #1, shall be removed in their
entireties. These five are as follows:
1. Dolphin Pile “L” - 21 H-Piles
2. Dolphin Pile “M” - 7 H-Piles
3. Dolphin Pile “N” - 5 H-Piles
4. Dolphin Pile “O” - 5 H-Piles
5. Dolphin Pile “P” - 3 H-Piles
Three of these 16 dolphins, cluster H-Piles at approximate pile lengths of 80 feet and located adjacent to Dock #4, shall be removed two feet below the mudline and replaced with one 60-inch diameter steel pipe pile and two 48-inch diameter steel pipe piles. These three are as follows:
1. Dolphin Pile “A” - 21 H-Piles (replace with 60-inch diameter steel pipe pile)
2. Dolphin Pile “B” - 7 H-Piles (replace with 48-inch diameter steel pipe pile)
3. Dolphin Pile “C” - 3 H-Piles (replace with 48-inch diameter steel pipe pile)
There are no time of year restrictions for in-water work for this project. However, if pile driving is occurring, the noise is anticipated to be above the behavioral noise threshold for ESA-listed species that may be present in the West Boat Basin. A “soft start” shall be required to allow animals an opportunity to leave the project vicinity before sound pressure levels increase. In addition to using a soft start at the beginning of the workday for pile driving, one must also be used at any time following cessation of pile driving for a period of 30 minutes or longer.
Please note that this solicitation is set aside for certified small businesses. This is not a request for proposals at this time; the solicitation requirements and contract documents which will include instructions for submission and the response date will be available on or about June 2023. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist ahmed.ismael@usace.army.mil.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING DIVISION 696 VIRGINIA ROAD
- CONCORD , MA 01742-2751
- USA
Primary Point of Contact
- AHMED ISMAEL
- AHMED.ISMAEL@USACE.ARMY.MIL
- Phone Number 9783188814
Secondary Point of Contact
History
- Jun 10, 2023 11:59 pm EDTPresolicitation (Original)