Skip to main content

An official website of the United States government

You have 2 new alerts

Water Wells

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Apr 19, 2022 03:39 pm PDT
  • Original Response Date: Apr 26, 2022 12:30 pm PDT
  • Inactive Policy: Manual
  • Original Inactive Date: May 01, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
    Beale AFB , CA 95903
    USA

Description

Beale AFB request interest for installing new water well systems. This notice is for market research purposes only and no requirement exists at this time. The information furnished will assist Contracting in understanding the business environment and market capabilities. The below well systems could be agricultural and/or commercial.

Major Work Elements

  1. Water Well
    1. Install new 6” water well with industry standard steel casing to a sufficient depth capable of maintaining approximately 10 gallons per minute (GPM) flow to an existing on-site storage tank and existing livestock water tank with non-potable water from the aquifer system below.
    2. Install drive shoe, conductor seal, new well pump and control system. 
    3. Flow meter, water softener, and filtration are NOT required.
  2. Electrical
    1. Water well will be powered by an existing pole mounted transformer located across the street.
    2. Provide new power supply wires and route overhead to an existing wooden pole located adjacent to the existing storage tank.
    3. Provide transition down pole to underground.
    4. Provide new electrical disconnect located near the well or at power pole and trench new wiring as needed.
  3. Plumbing
    1. Reduce piping sizes on the 4-inch outlet from tank to 2-inch and replace the existing gate valve with a brass ball valve and match piping to existing connections.
    2. Install new 2-inch brass wye strainers inline on both outlets after the valves. Rearrange piping as needed.
    3. Modify piping to existing booster pump.  Match reduced piping to existing booster pump piping. Provide valves and piping for a bypass of the booster pump.  Bypass features shall be galvanized steel with brass valves, installed above grade.  Above grade protective box to be modified as needed to accommodate bypass piping or replaced with new.
    4. Replace above ground portions of 1-inch booster pump piping with 1-inch galvanized streel piping
    5. Provide approximately 120-feet of flexible 1-inch piping, approved for direct burial, from the existing storage tank outlet under the road through an existing 4-inch steel pipe sleeve (piping from former well) to a location adjacent to the train tracks. 
    6. Provide appropriately sized new piping from new well to existing pressure/storage tank.

Contact Information