Skip to main content

An official website of the United States government

You have 2 new alerts

Z1DA--PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Feb 25, 2022 05:49 pm CST
  • Original Published Date: Jan 19, 2022 01:19 pm CST
  • Updated Date Offers Due: Mar 03, 2022 01:00 pm CST
  • Original Date Offers Due: Feb 17, 2022 01:00 pm CST
  • Inactive Policy: Manual
  • Updated Inactive Date: Apr 02, 2022
  • Original Inactive Date: Mar 19, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:

Description

SOLICITATION 36C25221B0017 AMENDMENT A0001 February 14, 2022 Project: Replace Chemistry Analyzer Project Number: 676-20-004 Location: Tomah VA Medical Center, Tomah, WI Amendment 0003 hereby incorporates the following clarifications/change(s) into the solicitation package. Solicitation RFI s/Questions and Answers Q1. There are three sections in Div. 27. None of them address the type of cable, jacks, patch panels, faceplates etc. that we are to provide. R1. Use the electrical and low voltage drawings together. If the low voltage sub only looks at the two low voltage sheets, they will be missing information. Q2. There is no spec provided for the controls on this project. Can you please ask who is responsible for controls and what they are, JCI? If we need to include them, can they provide specs and information about whether or not the temporary RTU is to be tied into the BAS controls? R2. The existing control system is JCI.  The intent is for the temporary unit to run continuously with its packaged controls to maintain a constant discharge temperature (50F match existing system).  The unit should only be operational as long as necessary to replace the coil component of the existing air handling unit (expecting days, not weeks).  All efforts should be made to minimize the use of the temporary unit. Q3. There is a 10 exhaust duct connection to existing duct in phase 2 at location D.5/x3.2, which drops down below an existing 34x10 SA duct. There is no indication if this exhaust duct is going to a hood or grille. The phase 2 demo plan shows that it is deleted from a nearby location, but again doesn t state what it is going to. R3. The duct in question serves an existing fume hood.  The fume hood is temporarily relocated in Phase 1 near E/2.1.  In Phase 2 the unit is relocated to its final location near D/3.4. B. Bid Schedule BID Opening DATE / TIME: Thursday, March 3, 2022 at 1:00 p.m. CST. LOCATION: Honey Creek Business Park 115 S. 84th Street - Suite 101 Milwaukee, WI 53214-1476. ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov Kristi Kluck --- Kristi.Kluck3@va.gov This solicitation can be monitored at https://beta.sam.gov/opp/a8d8f6ac82824111870acc5a792b45e2/view?keywords=36C25220B0011&sort=-relevance&index=&is_active=true&page=1&refresh=y Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.

Contact Information

Contracting Office Address

  • GREAT LAKES ACQUISITION CENTER 115 S 84TH ST
  • MILWAUKEE , WI 53214
  • USA

Primary Point of Contact

Secondary Point of Contact





History