Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Sep 13, 2023 01:30 pm EDT
- Original Published Date: Jun 21, 2023 02:57 pm EDT
- Updated Date Offers Due: Oct 29, 2023 03:00 pm EDT
- Original Date Offers Due: Jul 21, 2023 02:00 am EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 13, 2023
- Original Inactive Date: Aug 05, 2023
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Y1KZ - CONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
- Place of Performance: Ocean Beach , NY 11770USA
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project, New York. The work consists of dredging the Fire Island Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York).
The proposed dredging and beach nourishment work would involve dredging and placement of approximately 1,000,000 CY of sand at Gilgo Beach, subject to available funding. The project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth.
The purpose of the proposed work is to alleviate the effects of shoaling and maintain the project dimensions, thereby providing safe and economical use of the Fire Island Inlet waterway by commercial and recreational boating interests while providing beneficial use of the dredged sand. Between maintenance operations, the bypassed sand placed at the feeder beach would be carried by littoral drift to feed down drift beaches. The maintenance operation would thus serve to place sand trapped in the channel back into the normal littoral movement that naturally replenishes the western beaches, while maintaining a safe channel for navigation.
The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard criteria for an “ocean going vessel”.
The Contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than one hundred fifteen (115) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 12,500 cubic yards per calendar day.
The work is estimated to cost between $10,000,000 and $100,000,000. Plans and specifications for the subject project would be available in June 2023, with bid opening in July 2023. It is the intention of the government to award and NTP in August 2023.
Liquidated Damages of $2,790.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This is an unrestricted Procurement.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300
- NEW YORK , NY 10278-0004
- USA
Primary Point of Contact
- Orlando Nieves
- orlando.nieves@usace.army.mil
Secondary Point of Contact
- Nicholas P. Emanuel
- Nicholas.P.Emanuel@usace.army.mil
- Phone Number 9177908069
History
- Nov 13, 2023 11:55 pm ESTSolicitation (Updated)
- Sep 13, 2023 01:27 pm EDTSolicitation (Updated)
- Sep 02, 2023 11:55 pm EDTSolicitation (Updated)
- Aug 18, 2023 02:40 pm EDTSolicitation (Updated)
- Aug 15, 2023 09:58 am EDTSolicitation (Updated)
- Aug 10, 2023 05:22 pm EDTSolicitation (Updated)
- Aug 08, 2023 03:09 pm EDTSolicitation (Updated)
- Aug 04, 2023 06:33 pm EDTSolicitation (Updated)
- Jul 28, 2023 09:28 am EDTSolicitation (Updated)
- Jul 20, 2023 01:02 pm EDTSolicitation (Updated)
- Jul 19, 2023 03:19 pm EDTSolicitation (Updated)
- Jul 19, 2023 01:25 pm EDTSolicitation (Updated)
- Jul 11, 2023 10:25 pm EDTSolicitation (Updated)
- Jun 21, 2023 02:57 pm EDTSolicitation (Original)