Skip to main content

An official website of the United States government

You have 2 new alerts

Roof replacement at MFE ATCT (McAllen, TX)

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Dec 03, 2024 06:13 pm CST
  • Original Date Offers Due: Jan 27, 2025 06:00 pm CST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Feb 11, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    McAllen , TX 78503
    USA

Description

All work shall be performed IAW the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines. Performance includes, but is not limited to, the following:

Civil/Architectural:

Replace PVC roof membrane system on Cab Roof

Replace PVC roof membrane system on Tower Catwalk

Replace the vinyl Sidings of the ATCT including above and below the Cab windows

Construct stud structural framing and Exterior Insulation Finishing System (EIFS) on the ATCT

Construct perimeter foundation beam for EIFS

Replace the front exterior door (Storefront)

Reconstruct concrete side walk at storefront

Replace defogger system

Move all existing HVAC, electrical, utilities, and conduits away from the new building EIFS

Abate lead paint at building entrance and windows

Mechanical

Replace HVAC packaged unit on the 4th floor.

Install a mini split air conditioning unit in the Telecom room on the 4th floor.

Install common fresh air intake duct for the CAB HVAC units on the 4th floor.

Contact Information

Primary Point of Contact

Secondary Point of Contact





History