Installation of Campground Infrastructure and Associated Features in Numerous Park, Council Grove Lake, Kansas
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Sep 19, 2022 12:08 pm EDT
- Original Response Date: Sep 29, 2022 02:00 am EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date:
- Initiative:
- None
Classification
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
- NAICS Code:
- 236220 - Commercial and Institutional Building Construction
- Place of Performance: Council Grove , KSUSA
Description
1. Action Code: This is a Pre-Solicitation notice.
2. Date: 19 September 2022
3. Contracting Office Address:
USACE CEST-CT-E
2488 E. 81st Street
Tulsa, Oklahoma 74137-4290
4. Classification Code: Y – Construction of Structures and Facilities
5. Subject Title: Installation of Campground Infrastructure and Associated Features in Numerous Park, Council Grove Lake, KS
6. Solicitation Number: To be determined
7. Contact(s) Points:
Name Ronica R. Smith Shawn Brady
Phone 918-669-4386 918-669-7670
Email ronica.r.smith@usace.army.mil shawn.brady@usace.army.mil
8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2- Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) later date.
9. Description: The RFP for this project is expected to be issued on or about beginning of 1 October 2022. The Proposal due date is planned on or about, end of July 2022. The North American Industry Code Standard (NAICS) is 2336220 - Commercial and Institutional Building Construction, and the size standard is $39,500,000.00. No formal source selection, listed under FAR part 15, will be used for this requirement. This requirement will be awarded to the lowest priced quote meeting or exceeding the acceptability standards and time frame specified in the solicitation. Price and Past Performance will be evaluated in accordance with in DFARS 213.106-2(b)(i)(B)&(C).
BASE BID – the contractor shall install (3) pole mounted, solar-powered street light fixtures in
Outlet Park providing all the materials, labor, tools, and equipment necessary for site preparations
and installation in accordance with these contract specifications.
Option #1 – the contractor shall construct retaining walls and parking pad in Kit Carson Park (site
#1) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #2 – the contractor shall install (4) 50 amp electric pedestals in Richey Cove Park (sites 1-
4) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #3 – the contractor shall install (2) 50 amp electric pedestals in Canning Creek Park (sites
#18-19) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #4 - the contractor shall install (9) 50 amp electric pedestals in Santa Fe Trail Park (sites
1-9) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #5 - the contractor shall install (4) 50 amp electric pedestals in Santa Fe Trail Park (sites 10-
13) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #6 – the contractor shall install (8) 50 amp electric pedestals in Santa Fe Trail Park (sites
Group Camping Site #5-12) providing all the materials, labor, tools, and equipment necessary for
site preparations and installation in accordance with these contract specifications.
Option #7 – the contractor shall install (3) 50 amp electric pedestals in Santa Fe Trail Park (sites
15-17) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #8 – the contractor shall install (6) 50 amp electric pedestals in Canning Creek Park (sites
1-6) providing all the materials, labor, tools, and equipment necessary for site preparations and
installation in accordance with these contract specifications.
Option #9 – the contractor shall install new metal roofing on the south Shower House in Canning
Creek Park providing all the materials, labor, tools, and equipment necessary for site preparations
and installation in accordance with these contract specifications.
The contractor shall make all necessary arrangements for utility line locations. A
10. Place of Contract Performance: All work is located at Council Grove Lake, north of the city of Council Grove, in Morris County, Kansas.
11. Set Aside Status: This is a Small Business Set Aside
12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.beta.sam.gov when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS’ RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.
13. Period of Performance (POP): The POP is estimated for 120 days after the award of contract.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING DIVISION 2488 E 81ST STREET
- TULSA , OK 74137-4290
- USA
Primary Point of Contact
- ronica r smith
- ronica.r.smith@usace.army.mil
Secondary Point of Contact
- shawn brady
- shawn.brady@usace.army.mil
- Phone Number 9186694984
History
- Oct 14, 2022 11:56 pm EDTPresolicitation (Original)