CO FLAP US 36(1), Downtown Estes Park Loop
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Sep 02, 2022 12:03 pm MDT
- Original Date Offers Due: Oct 04, 2022 02:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Oct 19, 2022
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
- Place of Performance: , COUSA
Description
PROJECT DETAILS: CO FLAP US 36(1), Downtown Estes Park Loop
The project is located in Estes Park, Colorado and provides a for one-way two-lane couplet for traffic through Town and access to Rocky Mountain National Park. The scope of this project consists of a combination of reconstruction and rehabilitation of 2.3 miles of urban streets. The work includes construction of a new bridge at Ivy Street, retaining walls throughout the project, landscaping and irrigation, sidewalk, and a new roundabout at the intersection of Moraine Avenue, Crags Drive and Riverside Drive. Schedule A includes all the Downtown Loop work and Option X include milling and overlaying 1.3 miles West Elkhorn Avenue.
SIGNIFICANT QUANTITIES:
Schedule A:
- 20303-3600 Removal of Wall – 320 SQYD
- 20401-0000 Roadway Excavation – 10,700 CUYD
- 20801-0000 Structure Excavation – 840 CUYD
- 25501-2000 Mechanically Stabilized Earth Wall, Gabion Face – 2,800 SQFT
- 25801-0000 Reinforce Concrete Retaining Wall – 1,900 SQFT
- 30101-0000 Aggregate Base – 5,700 TON
- 40101-0600 Asphalt Concrete Pavement. Gyratory Mix, 1/2 -inch Nominal Maximum Size Aggregate, 0.3 to <30 Million ESAL Roadway – 5,800 TON
- 50101-1000 Minor Concrete Pavement, 9” Depth – 4,400 SQFT
- 55201-0200 Structural Concrete, Class A (AE) – 405 CUYD
- 55301-3500 Precast, Prestressed Concrete Slab – 607 LNFT
- 56501-0200 Drilled Shaft, 24-Inch Diameter – 240 LNFT
- 56501-0300 Drilled Shaft, 30-Inch Diameter – 70 LNFT
- 60201-0600 18-Inch Pipe Culvert– 1,000 LNFT
- 60202-1000 60-Inch Equivalent Diameter Are or Elliptical Pipe Culvert (Concrete) – 480 LNFT
- 60403-0000 Inlet (Various) – 37 EACH
- 60902-1000 Curb and Gutter, Concrete, 12-Inch – 5,700 LNFT
- 61101-0000 Water System – All LPSM
- 61110-1000 Irrigation System – All LPSM
- 61501-0100 Sidewalk, Concrete – 2,400 SQYD
- 61501-0200 Sidewalk, Colored Concrete (Stamped) – 2,300 SQYD
- 63502-2100 Temporary Traffic Control, Crash Cushion – 4 EACH
- 63506-0500 Temporary Traffic Control, Flagger – 10,500 HR
- 63501-0000 Temporary Traffic Control Management Plan – LPSM
- 63507-0700 Temporary Traffic Control, Traffic Supervisor – LPSM
- 63601-1000 System Installation, Traffic Signal – LPSM
- 63601-2000 System Installation, Lighting – LPSM
- 64604-3000 Fixture, Pedestrian Railing – 270 LNFT
- 64704-0000 Mitigation, streambed channel realignment - 400 LNFT
Option X:
- 40101-0600 Asphalt Concrete Pavement. Gyratory Mix, 1/2 -inch Nominal Maximum Size Aggregate, 0.3 to <30 Million ESAL Roadway – 4,000 TON
- 41301-0600 Asphalt Pavement Milling, 2-Inch Depth – 24,000 SQYD
Construction is anticipated between November 2022 and December 2024. Estimated total cost is $10 to $20 million.
Attachments/Links
Contact Information
Primary Point of Contact
- Ryan Phillips
- CFLAcquisitions@dot.gov
Secondary Point of Contact
History
- Dec 31, 2022 09:56 pm MSTPresolicitation (Original)
- Oct 25, 2022 10:56 pm MDTSolicitation (Updated)
- Oct 11, 2022 01:34 pm MDTSolicitation (Updated)
- Oct 07, 2022 12:21 pm MDTSolicitation (Updated)
- Oct 06, 2022 11:25 am MDTSolicitation (Updated)
- Oct 05, 2022 02:43 pm MDTSolicitation (Updated)
- Oct 03, 2022 10:21 am MDTSolicitation (Updated)
- Sep 29, 2022 10:26 am MDTSolicitation (Updated)
- Sep 29, 2022 09:24 am MDTSolicitation (Updated)
- Sep 15, 2022 12:06 pm MDTSolicitation (Updated)
- Sep 08, 2022 11:10 am MDTSolicitation (Updated)
- Sep 02, 2022 12:03 pm MDTSolicitation (Original)