Skip to main content

An official website of the United States government

You have 2 new alerts

Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 17, 2024 11:53 am EDT
  • Original Published Date: Jun 06, 2024 05:47 pm EDT
  • Updated Date Offers Due: Jul 24, 2024 12:00 pm EDT
  • Original Date Offers Due: Jul 17, 2024 12:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 17, 2025
  • Original Inactive Date: Jun 06, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z1KF - MAINTENANCE OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:

Description

Amendment 3 amends specifications and drawings. Amendment 0002 extends the date bids are due from 17 July 2024 at 12:00 pm to 24 July 2024 at 12:00 pm. Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

Contact Information

Contracting Office Address

  • KO CONTRACTING DIVISION 100 W OGLETHORPE AVE
  • SAVANNAH , GA 31401-3604
  • USA

Primary Point of Contact

Secondary Point of Contact

History