Skip to main content

An official website of the United States government

You have 2 new alerts

REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Nov 21, 2023 02:12 pm EST
  • Original Published Date:
  • Requirements Strategy:
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Dec 21, 2023
  • Original Inactive Date:
  • Authority:
  • Fair Opportunity / Limited Sources Justification Authority:
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Updated Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Virginia Beach , VA 23460
    USA

Description

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for new installation. Demolish as needed, insulation and metal jacket to disconnect water piping to the AHU. Existing piping may be reused if applicable to the new installation. Demolish and dispose of existing Air Handler Unit (AHU #3) complete. Provide all necessary equipment to remove and properly dispose of existing equipment. Provide and install (QTY 1) Air Handling Unit that meets or exceeds the existing specifications. Provide new outside air dampers and actuators. Contractor shall ensure the new AHU, outside air damper actuator and all controls are compatible with existing Direct Digital Controls (DDC) to ensure proper function and operation. All AHU specifications shall be verified by the contractor including dimensions, unit capacity, and electrical specifications.

ONLY CONTRACTORS ON THE UTILITY MECHANICAL CONSTRUCTION FOR HR MACC CONTRACT HOLDERS:  N4008523KD0043-0048 CAN BID ON THIS PROJECT.

Contact Information

Primary Point of Contact

Secondary Point of Contact





History