Skip to main content

An official website of the United States government

You have 2 new alerts

Z2DA-- Resurface Road and Parking Phase 3 - 666-22-123

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Feb 23, 2023 10:52 am MST
  • Original Published Date: Feb 14, 2023 04:31 pm MST
  • Updated Date Offers Due: Mar 17, 2023 02:00 pm MDT
  • Original Date Offers Due: Mar 22, 2023 02:00 pm MDT
  • Inactive Policy: Manual
  • Updated Inactive Date: May 21, 2023
  • Original Inactive Date: May 21, 2023
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Updated Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
  • Product Service Code: Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Sheridan , WY 82801
    USA

Description

The Sheridan VA Healthcare System has a need to repair and reconstruct all the roadways and parking lots as identified and detailed as Phase three (3) in the provided plans and specifications. Contractor shall demolish and remove existing asphalt, curb and gutter and provide a new surface for all roadways identified in Phase three. For all parking lots identified in Phase three, the contractor will remove existing asphalt, concrete wheel stops, curb and gutter and provide a new surface. Contractor shall furnish all labor and materials and perform work as required per the drawings and specifications. Operations shall include, demolition, utility demolition, utility capping, backfill and site work.  This project constitutes the third phase of the road and parking improvements. The primary drawings that constitute Phase 3 are all Key Map Sheets C,D,F,H,J,L,M,N,O,R,S,T,U,V,W,X.  Phases one and two will not be part of this project but Contractor shall use the full drawing set and specifications of project 666-17-104, updated red-lined data from the previous phases provided by the VA, and GPS located documents provided to the VA from the previous project to complete this final phase of the Road and Parking Lots improvement project.  The GPS document provided shall be for reference only, all locates shall be field verified by the contractor at his own expense.  The roadways and parking lots are all situated on the Sheridan VA Medical Center campus.

Contact Information

Contracting Office Address

  • 6162 S WILLOW DR SUITE 300
  • Greenwood Village , CO 80111
  • USA

Primary Point of Contact

Secondary Point of Contact





History