Skip to main content

An official website of the United States government

You have 2 new alerts

PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A 10GB WAVE SERVICE BETWEEN (BLDG) 533; (RM) 128; (FL) 1ST; 1225 PERSHING PL, PATRICK SFB, FL 32925 AND (BLDG) 570; (RM) DI-1; (FL) 1ST; 7115 SOUTH BOUNDARY BLVD, MACDILL AFB, FL 33621

Award Details

  • Contract Award Date: Jun 22, 2023
  • Contract Award Number: HC101323PA245
  • Task/Delivery Order Number:
  • Contractor Awarded Unique Entity ID:
  • Contractor Awarded Name: LEVEL 3 COMMUNICATIONS, LLC
  • Contractor Awarded Address: ,
  • Base and All Options Value (Total Contract Value): $127,419.70

General Information

  • Contract Opportunity Type: Award Notice (Original)
  • Original Published Date: Jun 22, 2023 02:07 pm CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Nov 22, 2023
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: DG11 - IT and Telecom - Network: Satellite Communications and Telecom Access Services
  • NAICS Code:
    • 517111 - Wired Telecommunications Carriers
  • Place of Performance:

Description

1. IN ACCORDANCE WITH INQUIRY HC101323QA204, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A 10GB WAVE SERVICE BETWEEN (BLDG) 533; (RM) 128; (FL) 1ST; 1225 PERSHING PLACE, PATRICK SFB, FL 32925 (PTRCKSFB/CCI) AND (BLDG) 570; (RM) DI-1; (FL) 1ST; 7115 SOUTH BOUNDARY BLVD, MACDILL AFB, FL 33621-5101 (MCDLLAFB/CCI). A. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR SG26APR238267. B. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. C. THIS 10GB WAVE TRUNK SUPPORTS BACKBONE SUSTAINMENT AND WILL REPLACE CCSD "62DA". 2. THE SERVICE DATE TO BE MET IS: 18 SEP 23 (SIP). THE GOVERNMENT WILL ASSESS CONSIDERATION IAW STANDARD PROVISION 42 FOR DELAY ON DELIVERY OF CIRCUIT ON CONTRACTED SERVICE DATE. 3. ESTABLISH TSP: TSP0MF4WU-01 4. SEE ATTACHMENTS AND UNIQUE INSTALLATION FACTORS FOR TECHNICAL REQUIREMENTS SPECIFIC TO THIS ORDER. 5. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION IN IDEAS. 6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY HC101323QA203 / TSR SG26APR238267 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM TSR INQUIRY HC101323QA204 / TSR SG26APR238270; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR INQUIRY HC101323QA203 / TSR SG26APR238267.

Contact Information

Contracting Office Address

  • 2300 EAST DRIVE BUILDING 3600
  • SCOTT AFB , IL 62225-5406
  • USA

Primary Point of Contact

Secondary Point of Contact

History

  • Nov 22, 2023 10:55 pm CSTAward Notice (Original)