Skip to main content

An official website of the United States government

You have 2 new alerts

Weapons Load Crew Training Facility

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 11, 2023 12:52 pm CDT
  • Original Published Date: Jun 22, 2023 12:27 pm CDT
  • Updated Date Offers Due: Jul 27, 2023 02:00 pm CDT
  • Original Date Offers Due: Jul 27, 2023 02:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 11, 2023
  • Original Inactive Date: Aug 11, 2023
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1BZ - CONSTRUCTION OF OTHER AIRFIELD STRUCTURES
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Montgomery , AL 36108
    USA

Description

The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 10,000 square foot building housing the Base’s Weapons Load Crew Training Facility. The new building’s structural system includes slab on grade with engineered fill soil stabilization, structural steel framing as well as load bearing masonry, open web joists, a pre-engineered metal building system and metal roof decking. The roof will have sloped standing seam roofing on rigid insulation. The exterior walls include veneer brick and stone, aluminum storefronts, translucent wall assemblies, and metal wall panels. Major building systems include a high efficiency air-cooled heat pump system and a geothermal heat pump for HVAC systems. Underground utility work for the facility will include all necessary power, sanitary, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, gas, water, and data. Site work will comprise of on-site access driveways and parking consisting of a combination of asphalt paving and concrete paving.

Contact Information

Contracting Office Address

  • KO FOR ALANG DO NOT DELETE 5187 SELMA HIGHWAY
  • MONTGOMERY , AL 36108-4824
  • USA

Primary Point of Contact

Secondary Point of Contact

History