Chickamauga Lock Replacement Approach Wall and Decommissioning

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Feb 04, 2025 06:45 pm CST
  • Original Published Date: Feb 04, 2025 06:43 pm CST
  • Updated Date Offers Due: Apr 07, 2025 02:00 pm CDT
  • Original Date Offers Due: Apr 07, 2025 02:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Feb 05, 2026
  • Original Inactive Date: Apr 22, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Chattanooga , TN 37415
    USA

Description

The U.S. Army Corps of Engineers, Nashville District (LRN) is issuing a Request for Proposal (RFP), W912P525RA001, for a single firm fixed-price construction contract for the Chickamauga Lock Replacement Approach Wall and Decommissioning Project in Chattanooga, TN. PROJECT DESCRIPTION: The scope of this project will consist of the construction of river and middle approach walls downstream from the lock, decommissioning the existing lock, the wet commissioning of the lock chamber constructed in the lock chamber contract, and site restoration activities at the project site. Downstream lock approach walls will be constructed from pre-cast concrete beams that were fabricated in 2012 and are currently stored at another Tennessee Valley Authority (TVA) facility until ready to be installed at the project. The downstream approach wall will extend under and through the Norfolk Southern Railway Bridge. Two (2) new 30-foot diameter mooring cells will be built downstream of the new lock. Once the existing lock is closed, a portion of the lock chamber and the associated wall culverts will be plugged with concrete. A concrete thrust block will be installed to resist concrete expansion in the dam, and the remaining area will be filled with stone. Miscellaneous equipment and buildings will be removed. No cofferdams will be required for decommissioning the existing lock, but installation of needle dams (similar to a cofferdam, but more temporary) may be required for dewatering of the chamber. The downstream approach wall, decommissioning of the existing lock, wet commissioning of the new lock, and site restoration contract is anticipated to be awarded in Fourth Quarter of Fiscal Year 2025 with a base and three (3) options.

Contact Information

Contracting Office Address

  • KO CONTRACTING DIVISION 801 BROADWAY RM A604
  • NASHVILLE , TN 37203-1070
  • USA

Primary Point of Contact

Secondary Point of Contact

History