Third Port Improvements Project located in Ft. Eustis, VA.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Aug 22, 2022 01:05 pm EDT
  • Original Published Date: Jul 21, 2022 03:43 pm EDT
  • Updated Date Offers Due: Aug 29, 2022 01:00 pm EDT
  • Original Date Offers Due: Aug 22, 2022 12:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 31, 2022
  • Original Inactive Date: Dec 31, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1KF - CONSTRUCTION OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:

Description

The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the 3rd Port Improvements project sponsored by Joint Base Langley-Eustis. The main objective of the project is to remove three existing piers and replace with three new piers that will accommodate five new vessels, MSV (L), to replace deteriorating bulkheads from pier 8 through pier 14, where the new finger piers will be located, remove a mooring pile line located along the northern edge of the current maintenance dredging prism and re-align the line further east, away from encroaching land, and dredge in the area if the new finger piers and mooring pile lines. The utilities for the vessels will be updated as well to accommodate the requirements of the new vessels. The new utility work will include new sanitary sewer (SS) lines from the new pier locations over to the nearest SS manhole, new bilge lines that will run from the new pier locations up to an existing holding tank, and new electrical distribution lines and transformers will be required to provide shore power to the new vessels. Dredging of the creek bottom in the finger piers to a depth of 17 feet will be required. Up to one (1) foot of over depth will be allowed. Dredging shall be accomplished by mechanical and/or hydraulic means and methods with dredged material hydraulically placed by pipeline into the nearby upland placement site, Fort Eustis Dredged Material Management Area (FEDMMA). *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622B2017' to obtain more details.*

Contact Information

Contracting Office Address

  • KO CONTRACTING OFFICE 803 FRONT STREET
  • NORFOLK , VA 23510-1096
  • USA

Primary Point of Contact

Secondary Point of Contact