ILWW New Carport
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 13, 2024 10:16 am CDT
- Original Response Date: May 28, 2024 02:00 pm CDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jun 12, 2024
- Initiative:
- None
Classification
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5450 - MISCELLANEOUS PREFABRICATED STRUCTURES
- NAICS Code:
- 332311 - Prefabricated Metal Building and Component Manufacturing
- Place of Performance: Peoria , IL 61603USA
Description
The US Army Corps of Engineers, Rock Island District, Illinois Waterway Project (ILWW) has the requirement for the entire supply and installation of one carport. The carport will provide protection for machinery and cranes.
SPECIFICATIONS: 30’ x 45’ x 12’ Vertical Roof Carport with 3-Closed Sides -
Vertical Roof
Base Width 30’
Base Length 45’
Sidewalls Height 12’ (12’ horizontal clearance or greater on open/entrance end.)
Left and right sidewalls completely enclosed.
Completely enclosed back.
Gable only front, open/entrance end.
Installed location will be on gravel (CA6) that has approximately 0” to 1/8” per foot slope. The grade is comprised of approximately 18” deep compacted CA6 and below the CA6 is sand.
Engineer Certified (Building Permit not required):
- Completed installation shall be engineer certified for up to 130mph winds, or greater, and a snow load rating of 40 lbs. per square foot, or greater. Carport shall require anchoring to meet the above requirement.
The contractor shall provide all materials, tools, personnel, equipment, installation, and documents to complete the requirement.
After receipt of order (ARO), the Contractor shall complete within 8-weeks.
1-year, or greater, warranty on product and installation defects, which starts after installation is complete by the Contractor.
Quote for standard paint colors. One and no more than two colors will be provided for panels after notice to proceed is authorized.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING DIVISION 1 ROCK ISLAND ARSENAL
- ROCK ISLAND , IL 61299-5001
- USA
Primary Point of Contact
- Kate Behrens
- Katherine.D.Behrens@usace.army.mil
Secondary Point of Contact
- Nicholas Moore
- Nicholas.M.Moore@usace.army.mil
History
- Jun 12, 2024 10:55 pm CDTSolicitation (Original)
- Jun 12, 2024 10:55 pm CDTPresolicitation (Original)