CA FTNP SEKI 13(2) Mineral King Road

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Sep 09, 2024 03:07 pm MDT
  • Original Response Date: Sep 24, 2024 02:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Oct 09, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    CA
    USA

Description

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Full and Open Competition with HUBZone price preference

PROJECT NUMBER: CA FTNP SEKI 13(2)

PROJECT NAME: MINERAL KING ROAD

PROJECT DESCRIPTION: 

The project proposes to rehabilitate up to 15.20 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI).  The project is located east of Visalia in Tulare County, CA.

SCOPE OF THE WORK: 

The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway.  Parking lots will be rehabilitated or paved to improve visitor access.  Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway.  The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures.   

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width.  Public access will have to be maintained during construction with intermittent allowable closures depending on season and time.  The road is inaccessible during winter due to extreme weather and snowpack.  The project is in an environmentally sensitive resource area within the National Park Service.

PRINCIPAL WORK ITEMS:

22,500 LF Ditch Excavation

1,900 CY Rip Rap

700 CY Special Rock Embankment

1800 SF Soil Nail Retaining Wall

6,500 Tons Roadway Aggregate, Method 2

7.5 Miles Full Depth Reclamation, Method 2

4.5 Miles Full Depth Reclamation, Method 2 with Cement

26,000 Tons Asphalt Pavement

380 LF Steel H Piles, In Place

9,800 LF 24” to 48” Culverts

70 Each Inlet (Concrete Box Inlet)

37,000 LF Paved Ditch, Asphalt

80 Each Dry Stacked Headwall

ANTICIPATED SCHEDULE: 

Preshow Onsite Meeting – September 2024

Advertisement – September 2024

Construction – April 2025 through October 2027

ESTIMATED COST RANGE: 

Between $25,000,000 and $35,000,000