American River Common Features 2016 Sacramento Weir Widening Yolo County, CA

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Mar 03, 2023 03:49 pm PST
  • Original Published Date: Jan 31, 2023 02:13 pm PST
  • Updated Date Offers Due: Apr 03, 2023 10:00 am PDT
  • Original Date Offers Due: Apr 03, 2023 10:00 am PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Mar 02, 2024
  • Original Inactive Date: Jan 31, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:

Description

The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport ChannelThe Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat