Skip to main content

An official website of the United States government

You have 2 new alerts

Surrey Bus Seat Conversion

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Jan 22, 2024 05:52 pm EST
  • Original Response Date:
  • Inactive Policy: Manual
  • Original Inactive Date: Feb 04, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Beale AFB , CA 95903
    USA

Description

The contractor shall perform the following removal, installation, and modification to the F450 Super Duty bus. 

1)     Remove existing seats and all encompassing related hardware.
2)     Remove existing seat railing system and all encompassing related hardware.
3)     Remove existing floor covering and all encompassing related hardware.

1)    By re-utilizing the existing seats, install as many of the seats as possible along the sides and rear of the interior passenger area.
2)     Install new non-slick flooring that is neutral and matte in color.
3)     View Attachment 1 for photos of desired outcome and current seating arrangement.

1)    The seating shall be arrange so that the passengers will face the center of the passenger area.
2)    There shall be no seats along the forward wall in the passenger area (the wall behind the driver’s seat).
3)    The new flooring shall be non-slick, preferably a rubber material, and create a flush finish against the walls.
4)    The new flowing shall create an even walking ground without any raised areas, bumps, or dips.

The contractor shall perform a pre-inspection in accordance with the manufacturer’soperational checklist (Air Force Form 1800). A copy of the checklist will be provided to the QAP at the time of the pre-final inspection.

Contact Information

Primary Point of Contact

Secondary Point of Contact

History