VA GLA WATERLINES REPLACEMENT PROJECT

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 23, 2024 05:58 pm PDT
  • Original Published Date: Jun 13, 2024 10:58 am PDT
  • Updated Date Offers Due: Jul 30, 2024 01:00 pm PDT
  • Original Date Offers Due: Jul 18, 2024 01:00 pm PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 24, 2025
  • Original Inactive Date: Jun 13, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: C221 - ARCHITECT AND ENGINEERING- GENERAL: PLUMBING SYSTEMS
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:

Description

Existing Conditions: Existing 5 main water lines (6? Domestic Hot Water, 8? Cold Water Pressurized, 8? Cold Water Supply, 12? Fire Water, and 6? Condensate) from Building 501 (Chiller Building) to Building 500 (Hospital) including Building 501 basement, Building 500 basement, and the tunnel from 501 to 500. Because these existing water lines are in bad condition/end of their useful life, they need to be replaced to prevent catastrophic failure/see examples below. Objective: Construct 5 bypass lines, approx. 450? and divert water to these pipes. Then replace approx. 400? of the 5 lines. Then remove the bypass lines. Notes:-Current tunnel includes a pipe rack with multiple pipes, and an adjacent walkway. The space is tight. To allow for proper replacement of the 5 pipes, a bypass route has been defined to bypass the lines and allow the hospital to fully function during replacement of pipes.-Contractor to provide all parts, equipment, labor and materials required to make a harmonized removal, for connections of existing wet supply lines and reinstallation of diverse water lines parallel to existing system and consistent with any new piping, fittings, valves, regulators, strainers for regulators, gages, manifold, isolation valves and redundant bypass-Contractor will provide and maintain temporary water service for main hospital during alterations-Contractor must have knowledge of/past performance with methodology of construction procedures/phasing schedules at VA facilities-Not a DB or DBB project-Design being completed at USACE Los Angeles District by USACE Engineers.

Contact Information

Contracting Office Address

  • KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
  • LOS ANGELES , CA 90017-3409
  • USA

Primary Point of Contact

Secondary Point of Contact

History