North Fork Negrito Fence
Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: May 01, 2024 08:44 am MDT
- Original Date Offers Due: May 17, 2024 04:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jun 01, 2024
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code:
- NAICS Code:
- Place of Performance: Reserve , NM 87830USA
Description
The USDA Forest Service Gila National Forest, Reserve Ranger District, New Mexico, is seeking to remove the existing exclosure fence which is a 4-strand barbed wire and metal post fence and install a 2-rail metal pipe / 2-wire smooth strand exclosure fence around the North Fork Negrito Creek site. The contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the project
The contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete a 2-rail metal pipe / 2-wire smooth strand exclosure fence around the North Fork Negrito Creek exclosure site. The total length of pipe rail fence to be installed in 0.51 miles. The work to be completed includes transportation of metal pipe (supplied by the U.S. Forest Service) from the Reserve Ranger District Office in Reserve, NM to the project site, installation (including cutting and welding of the metal pipe rails and setting of the pipe posts) of the new pipe rail fence according to the specifications listed in Appendix A, and removal and disposal of the existing barbed wire fencing material.
The existing North Fork Negrito Creek exclosure fence is a 4-strand barbed wire and metal post fence located along the North Fork of Negrito Creek. The exclosure fence purpose to protect the riparian area along the creek by prohibiting entry inside the exclosure by domestic livestock. Due to environmental conditions at the site the fence is often damaged due to falling trees or flood waters creating gaps making livestock entry possible. The intent of this project is to replace the barbed wire fence with a welded, 2-rail metal pipe / 2-wire smooth strand fence that is more robust to floods and other disturbances.
Attachments/Links
Contact Information
Primary Point of Contact
- Kimberly Grezeszak
- kimberly.grezeszak@usda.gov
- Phone Number 2089861523