Skip to main content

An official website of the United States government

You have 2 new alerts

Design Build Contract for World Trade Bridge (WTB) Land Port of Entry (LPOE), Border Roadway Improvements & Construction (BRIC)/Paving Project, Laredo, TX

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Dec 03, 2024 11:42 am CST
  • Original Date Offers Due: Jan 09, 2025 03:00 pm CST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Jan 24, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Laredo , TX 78043
    USA

Description

TITLE OF PROJECT: Design-Build for World Trade Bridge (WTB) Land Port of Entry (LPOE), Border Roadway Improvements & Construction (BRIC) Project, Laredo, Texas

The Inflation Reduction Act (IRA) of 2022, Pub. L. No. 117-169, enacted in August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements. Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation will contain an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon.

DESCRIPTION OF PROPOSED WORK:  The U.S. General Services Administration (GSA) Greater Southwest Region, Acquisition Management Division, Capital Investment Program is seeking design and construction services for the BRIC project to include roadway repairs and/or paving replacement at the WTB LPOE. 

The design-build contractor shall design and construct roadway repairs and/or paving replacement at the designated LPOE to improve the overall function of the port utilizing Low Embodied Carbon (LEC) materials, to include LEC asphalt, concrete, and steel.  The contractor will be responsible for providing all labor, materials, transportation, supervision, and management to perform design and construction.

This design-build project involves replacement of approximately 916,997 square feet (sf) of concrete pavements; repairs to include complete reconstruction of 11.5" and 14" continuously reinforced concrete pavement (CRCP), 12" to 14.5” surface reconstruction, 4" & 9" jointed reinforced concrete pavement (JRCP) patches, plane & portland cement concrete (PCC) overlay and joint seals.

This WTB LPOE BRIC project is a small business set-aside. The small business firm/contractor must have NAICS code 237310 (Highway, Street, and Bridge Construction); the current small business size standard is $45 million.  It is anticipated that this project will take approximately 420 calendar days to complete.

Award of any resulting procurement will be based on a source selection employing a “Best Value Concept” methodology.  

GENERAL CONSTRUCTION REQUIREMENTS:  In accordance with FAR 36.204, disclosure of the magnitude of construction projects, the construction cost of magnitude is between $10,000,000 and $20,0000.

LOCATION OF THE WORK:  World Trade Bridge Land Port of Entry, 715 Bob Bullock Loop, Laredo, Texas 78043.

THIS PROCUREMENT IS A SMALL BUSINESS SET-ASIDE FOR AWARD TO SMALL BUSINESS FIRMS.   

AMENDMENTS TO SOLICITATION:  It is the offeror's responsibility to monitor SAM.gov for the release of any amendments.

IMPORTANT DATES: 

1. VIRTUAL PRE-PROPOSAL CONFERENCE: December 10, 2024 at 10:00 a.m. CST

NOTE: All offerors who would like to attend the pre-proposal conference and site visit/walk will need to email the attendee(s) name, company name, attendee(s) email address and phone number to temica.stewart@gsa.gov of those planning on attending no later than December 9, 2024, at 12:00 p.m. CST  to receive a meeting invite (Google Meet) to the meeting.

2. SITE VISIT: December 12, 2024 at 10:30 a.m. CST

3. PROPOSAL DUE DATE: January 9, 2025 at 3:00 p.m. CST

Contact Information

Contracting Office Address

  • R7 PROG SUPPORT - CAPITAL AND IDIQ 819 TAYLOR STREET
  • FORT WORTH , TX 76102
  • USA

Primary Point of Contact

Secondary Point of Contact

History