Lynnhaven River Basin Phase II Reef
Looking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General Information
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Oct 31, 2023 11:08 am EDT
- Original Published Date: Sep 25, 2023 12:00 pm EDT
- Updated Date Offers Due: Oct 26, 2023 02:00 pm EDT
- Original Date Offers Due: Oct 26, 2023 02:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Oct 17, 2024
- Original Inactive Date: Sep 24, 2024
- Initiative:
- None
Classification
- Original Set Aside:
- Product Service Code: 5450 - MISCELLANEOUS PREFABRICATED STRUCTURES
- NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
- Place of Performance:
Description
Bid Due Date is 26 OCT 2023 at 2:00 PM EDT. Amendments 0001 and 0002 should be acknowledged with all Bids.
The purpose of this acquisition is to construct the Lynnhaven River Basin Phase II Reef. The reef will be constructed with a targeted height of 12 inches off the river bottom, with the alternative base substrate layer (Size 2 crushed stone) being approximately 6 inches thick and the top fossil oyster shell layer being approximately 6 inches thick. For the fossil shell layer, the Project requires transporting the shell from an existing pile on Craney Island prior to placement within the project boundaries. The shell must also be sorted, clean from debris and fine sediments. All reef substrates will be placed by mechanical clamshell from a barge and recorded by GPS system to ensure proper placement. As-built surveys will be required between substrate layer placement to ensure targeted height is being reached. Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 7.0? MLLW to 8.3? MLLW. The construction period of performance will be approximately 720 days from issuance of the NTP.
Attachments/Links
Contact Information
Contracting Office Address
- KO CONTRACTING OFFICE 803 FRONT STREET
- NORFOLK , VA 23510-1096
- USA
Primary Point of Contact
- Stormie Wicks
- STORMIE.B.WICKS@USACE.ARMY.MIL
- Phone Number 7572017215
Secondary Point of Contact
- MICHAEL STEVENSON
- michael.l.stevenson@usace.army.mil
- Phone Number 7572011355
History
- Oct 17, 2024 11:55 pm EDTSolicitation (Updated)
- May 15, 2024 11:55 pm EDTAward Notice (Original)
- Oct 30, 2023 09:29 am EDTSolicitation (Updated)
- Oct 25, 2023 02:36 pm EDTSolicitation (Updated)
- Oct 18, 2023 09:25 am EDTSolicitation (Updated)
- Oct 03, 2023 01:23 pm EDTSolicitation (Updated)
- Sep 25, 2023 12:00 pm EDTSolicitation (Original)