Skip to main content

An official website of the United States government

You have 2 new alerts

Z2DA--Replace Flooring, Dish Room, 2B-102m at Oklahoma City VAMC, in Oklahoma City, OK (VA-24-00023855)

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Dec 13, 2023 10:56 am MST
  • Original Date Offers Due: Jan 23, 2024 10:00 am MST
  • Inactive Policy: Manual
  • Original Inactive Date: Apr 22, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 238330 - Flooring Contractors
  • Place of Performance:

Description

Oklahoma City Veterans Affairs Health Care System (OKC VA HCS) Statement of Work (SOW) Replace Flooring, Dish Room 2B-102m Project Name: Replace Flooring, Dish Room GENERAL: This project is to replace flooring in Dish Room, 2B-102m at the OKC VA HCS at Oklahoma City, Oklahoma. The contractor is fully responsible for verifying and validating all information contained within this statement of work. Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA HCS. VA facilities are tobacco free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor s compliance with this policy. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards. JUSTIFICATION: Existing flooring has numerous amount of cracks which is causing leaks to reach underneath the existing tile flooring. Replacing the tile flooring will alleviate any leak issues. STATEMENT OF WORK: The contractor shall provide supervision, manpower, and materials to remove existing tile flooring and install new flooring tile. Contractor shall remove existing tile flooring & cove base. Contractor shall prepare cove base & floor for new flooring as per flooring manufacturer installation instructions. Contractor shall apply Laticrete Hydroban waterproofing and crack isolation. Contractor shall utilize epoxy grout to match nearby existing color. Contractor shall confirm with CO/COR style color of cove base (5x6 Round Top Base (Q3565F1P). Contractor shall confirm with CO/COR style/color of flooring tiles to be installed (Dal Tile Quarry Tile 0Q40 Red Blaze 6x6 (66F1P). Kitchen equipment will be removed prior to work. Contractor shall dispose any trash or debris they generate during the duration of the performance period and completion of project. Clean up area after project completion and contact COR for final inspection. PHOTO REFERENCES: Dish Room Work Schedule Normal working hours are from 7:30 AM to 4:30 PM (local time) Monday through Friday except for weekends and established Federal Holidays. Location of Work All work associated with this project will be completed at the Oklahoma City VA Health Care System, located at 921 NE 13th Street, Oklahoma City, OK 73104. Period of Performance This contract is expected to start upon Notice to Proceed (NTP) and be completed within 30 calendar days of issuance. The following Federal legal holidays are observed by this facility: New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

Contact Information

Contracting Office Address

  • 6162 S WILLOW DR SUITE 300
  • Greenwood Village , CO 80111
  • USA

Primary Point of Contact

Secondary Point of Contact





History