Skip to main content

An official website of the United States government

You have 2 new alerts

Hangar Doors B130 Eglin AFB - FTFA 19-CR36

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 11, 2022 04:23 pm CDT
  • Original Published Date: May 24, 2022 04:40 pm CDT
  • Updated Date Offers Due: Jul 25, 2022 12:00 pm CDT
  • Original Date Offers Due: Jul 11, 2022 12:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 30, 2022
  • Original Inactive Date: Jul 30, 2022
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Eglin AFB , FL 32542
    USA

Description

Eglin Air Force Base (AFB), FL has a requirement to replace remove and replace the two sets of hangar doors at Hangar 130 on Eglin AFB, FL.  The North American Industry Classification System (NAICS) code for this requirement is 236220 Commercial and Institutional Building Construction Contractors with a size standard of $39.5M.  Statement of Magnitude is between $5,000,000 and $10,000,000.  This is a Small Business Set-Aside competitive acquisition utilizing a best value source selection process and award will be made based upon the Best Value to the Government in accordance with FAR Part 15.3.

This project includes, but is not limited to the following, the new hangar doors will be replaced with new structural steel frame, insulated hangar doors rated to 150 mph with impact rated windows.  Provide four insulated hollow metal personnel doors with half glass windows, equipped with closers and panic hardware.  Install new door openers.  Remove and replace hangar door electrical circuits.  Replace existing rails and install new rail drainage system that ties into the existing storm water drainage system IAW Unified Facilities Criteria (UFC) 4-211-01.  New hangar doors shall match the look of the existing historic doors and windows.  The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the specifications.

8 June 2022 - Formal Release of Amendment 001

The purpose of Amendment 001 is:

  1. To clarify email submittals will not be accepted.
  2. To change the proposal submittal from the PIEE system to DOD SAFE. As part of this change, a link must be requested NLT than 72 hours prior to the proposal due date of 11 July 2022 at 1200 PM Central (local Eglin time). The deadline to request a DOD SAFE Link or a Base Access Pass is 8 July 2022 NLT 1200 PM Central (local Eglin time).
  3. An updated Section L addressing these changes is provided. All changes have been highlighted.

9 June 2022 - Release of Site Visit Sign In Sheet

  1.  A copy of the Sign In Sheet from the 8 June 2022 Site Visit has been added to the attachments.

15 June 2022 - Formal Release of Amendment 002

The purpose of Amendment 002:

  1. Provide updated language in Section L 4.4.1 regarding submission of Past Performance Customer Questionnaires (Attachment L5). CPARS or previously completed Past Performance Customer Questionnaires (Attachment L5) for each project submitted on Attachment L3 (Past Performance Information) are acceptable. Revised language is highlighted for ease of reference.
  2. Remove the requirement for bid-bonds, box 13b on the SF 1442.

Additionally, RFIs that have been answered to date are being posted (Hangr 130 Doors RFI Form_061522).

21 June 2022 - Replacement of Attachment L1, 50 Divison Cost Estimating Worksheet

  1.  A blank version of the 50 Division Cost Estimating Worksheet is being provided as an revised Attachment L1.\

28 June 2022 - Formal Release of Amendment 003

The purpose of Amendment 003:

  1. Extend the Proposal Due Date to  25 July 2022 12:00 PM Central Standard (Local Eglin time).

8 July 2022 - RFI UPDATE

The RFIs and Amendment will be posted NLT Wednesday, 12 July 2022. The proposal deadline will be adjusted accordingly.

11 July 2022 - Formal Release of Amendment 004

The Purpose of this Amendment is:

  1. To officially respond to RFIs. Hangar 130 Doors RFI Form_071122.
  2. Post Addendum 001 in response to RFIs, which includes revised drawings.
    FTFA19-CR36 RepairHangarDoorsBldg130-Addendum001-Summary.

The proposal due date will not be adjusted based on answers and Addendum being posted today.

Contact Information

Contracting Office Address

  • ADMIN ONLY NO REQTN CP 850 882 5040 308 WEST D AVE BLDG 260 STE 130
  • EGLIN AFB , FL 32542-5418
  • USA

Primary Point of Contact

Secondary Point of Contact

History