Skip to main content

An official website of the United States government

You have 2 new alerts

B & F Project 24Z1AIT Building 1 Interior Upgrade Sprinkler System

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Sep 12, 2024 03:28 pm CDT
  • Original Date Offers Due: Sep 17, 2024 10:00 am CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Sep 17, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Bartlett , TN 38134
    USA

Description

The FCI Memphis is a facility with a rated capacity of 862 low-security inmates within a secure perimeter fence. The Building I was previously utilized in a factory setting when FPI(Federal Prison Industries) used the building. The sprinkler system of Building I will need some upgrades due to the change of use for an inmate programming unit. 

The contractor will provide labor, equipment, and materials needed to complete the project at Building I. The work includes, but is not limited to the following: 

1. The contractor will furnish and install a new backflow preventer at the base of the wet pipe system.

2. The contractor will remove existing pendant fire sprinkler heads and drops throughtout the openceiling with rotating existing pipe upward for new tees and sprinkler heads.

3.  The contractor will disconnect and cap the 2-inch fire sprinkler line through the wall for the adjacent building that is being demolished. 

4. The classrooms and restrooms will need the fire sprinkler heads replaced and fitted for new grid/sheetrock ceilings. See the attached approved drawings of the layout. 

5. Install new fire sprinkler piping above grid/sheetrock ceilings in restrooms to add fire sprinkler coverage and adjust fire sprinkler heads for proper clearances.

6. Install sway braces, retainer straps, and flexible couplings to protect the system piping from damage due to earthquakes in accordance with NFPA 13. 

7. Test all new fire sprinkler systems in accordance with NFPA 13.

Contact Information

Primary Point of Contact

Secondary Point of Contact

  • Latina Barden
  •   lbarden@bop.gov
  •   Phone Number 9013845540
  •   Fax Number 9013845457

History