Skip to main content

An official website of the United States government

You have 2 new alerts

PTAC AC/Heat Units

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Jun 21, 2024 07:14 am CDT
  • Original Date Offers Due: Jul 09, 2024 01:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Jul 24, 2024
  • Initiative:
    • None

Classification

  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 4120 - AIR CONDITIONING EQUIPMENT
  • NAICS Code:
    • 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
  • Place of Performance:
    Fountain City , WI 54629
    USA

Description

The contractor shall supply ten (10) 9,000 BTU class Packaged Terminal Air Conditioner (PTAC) units. These units will be installed by USACE personnel on the Taggetz Quarters Barge. The units must include hydronic heating capability, fit into the sleeves already installed, be compatible with existing wired thermostats, and have corrosion resistant grills. Units must brand new, 230/208 volt, 1 phase, 15 Amp max draw, and include 15 Amp plugs. These units must be “plug and play,” not requiring electrical wiring, changes to plumbing, or replacement of external sleeves. The units are to be installed (by USACE) in the crew quarters, to replace Amana model PTC073B00HJ and PTC093B00HJ units that have failed. These PTAC units are installed in sleeves with a rough opening of 16.25” x 43.25”. The units must have hydronic heating kits installed, which regulate the flow of water from a central boiler to control heat. The proposed units should be the same as Amana PTC093J or PTC093K units, or equal, in terms of fit and function. The contractor shall supply ten (10) 9,000 BTU class Packaged Terminal Air Conditioner (PTAC) units. These units will be installed by USACE personnel on the Taggetz Quarters Barge. The units must include hydronic heating capability, fit into the sleeves already installed, be compatible with existing wired thermostats, and have corrosion resistant grills. Units must brand new, 230/208 volt, 1 phase, 15 Amp max draw, and include 15 Amp plugs. These units must be “plug and play,” not requiring electrical wiring, changes to plumbing, or replacement of external sleeves. The units are to be installed (by USACE) in the crew quarters, to replace Amana model PTC073B00HJ and PTC093B00HJ units that have failed. These PTAC units are installed in sleeves with a rough opening of 16.25” x 43.25”. The units must have hydronic heating kits installed, which regulate the flow of water from a central boiler to control heat. The proposed units should be the same as Amana PTC093J or PTC093K units, or equal, in terms of fit and function.

Contact Information

Contracting Office Address

  • KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500
  • SAINT PAUL , MN 55101-1323
  • USA

Primary Point of Contact

Secondary Point of Contact

History