BITTERROOT NATIONAL FOREST - Little Rock Creek Trail Bridge Replacement

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Aug 27, 2024 08:40 am MDT
  • Original Published Date:
  • Requirements Strategy:
  • Inactive Policy: Manual
  • Updated Inactive Date: Sep 30, 2024
  • Original Inactive Date:
  • Authority:
  • Fair Opportunity / Limited Sources Justification Authority:
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Updated Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    MT
    USA

Description

PROJECT DESCRIPTION: The project is for the removal of an existing 35-ft single log
foot bridge over Little Rock Creek on Forest Service Trail #580 at milepost 2.87, and
installing a new 41-ft glulam stringer pack/pedestrian trail bridge with rock-filled
gabion basket foundation.
This project includes:
1) Dispose of an existing approximate 35-ft long single log foot bridge,
2) Construction of a new 41-ft, glulam stringer bridge, including associated trail
approach work, footings, and drainage improvements.

PROJECT LOCATION: This project is located at milepost 2.87 over Little Rock Creek on
Forest Trail # 580 on the Darby Ranger District, USFS, in Ravalli County, MT, Section 35,
Township 4 North, Range 22 West. The project is approximately 3 miles west of the
Lake Como Recreation Area, which is located approximately 8 miles northwest of
Darby, MT.
This project is located three miles from the closest road. Helicopter flights and
mechanized/motorized use is allowed at the site. There is no vehicular access to the
bridge site.

PERIOD OF PERFORMANCE: It is anticipated that work can begin September 15, 2025
with work being completed by November 14, 2025. Contract period of performance is
60 days.


MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $100,000 and $250,000.

AMENDMENT 001 - Updated Attachment J-2 Standard Glulam Stringer Trail Bridge Drawings

Question and Answers as of 8/23/2024

Updated Questions and Answers as of 8/27/2024