Skip to main content

An official website of the United States government

You have 2 new alerts

NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge

info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here.

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information

  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Nov 13, 2024 04:29 pm MST
  • Original Published Date: Oct 15, 2024 10:22 pm MDT
  • Updated Date Offers Due: Nov 26, 2024 02:00 pm MST
  • Original Date Offers Due: Nov 19, 2024 02:00 pm MST
  • Inactive Policy: Manual
  • Updated Inactive Date: Jan 26, 2025
  • Original Inactive Date: Jan 19, 2025
  • Initiative:
    • None

Classification

  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Las Vegas , NM
    USA

Description

PROJECT NUMBER:  NM ERFO FS SNTFE 2022-1(1)

PROJECT NAME:  EL PORVENIR BRIDGE

PROJECT DESCRIPTION:  The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM.

The project is considered 4R and located in Mountainous terrain.

SCOPE OF THE WORK:  The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.

Contact Information

Contracting Office Address

  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA

Primary Point of Contact

Secondary Point of Contact

History